Tak
e and folder operations
Chec
king and editing tak
e metadata
68
Editing project names
5.
Use
to select
Project
Name
, and press
.
6.
Edit the project name.
See "Character input screen"
(
→
P.13) for how to input
characters.
NOTE
•
The project name is written to the <PROJECT> metadata.
•
The project name used immediately after recording includes the
name of the highest level folder (inside the SD card root direc-
tory) that contains the folder in which the take was recorded.
Checking and editing take metadata
(continued)
Checking and editing track names
5.
Use
to select
Track
Name
, and press
.
6.
Use
to select the track,
and press
.
7.
Use
to select
Edit
,
and press
.
Содержание F8n
Страница 197: ......
Страница 198: ...Z2I 3266 01 ZOOM CORPORATION 4 4 3 Kanda surugadai Chiyoda ku Tokyo 101 0062 Japan http www zoom co jp ...