40
Level the Z aixs - step 1
Step 1:
adjust the Z axis left and right slider components to the same height,
steps as following:
1. loosen the set screws of the Z-axis timing pulley
(fig 1)
.
2. Manully Rotate the lead screws (
fig 5 and 6
) to move down the hotbed to the bottom,
until both of the right and left copper nut touched the timing pulleys.
3. Tighten the set screws lock the timing pulleys to the lead screw again.
1
Содержание Z9 Series
Страница 1: ...Model Z9 Serial 4th Version User Manual...
Страница 6: ...6 Assemble hot bed A2 1 Hot bed bottom M4 nut 4 Note Connector KM4x30 4...
Страница 13: ...13 Aluminum profile preview Z9 A Z9 A Z9 Z Z9 B Z9 BP Z9 X Z9 B Z9 B Z9 AP Z9 Z Z9 Z Z9 Z Z9 A...
Страница 14: ...14 About aluminum profiles Z9 Z 4PCS Z9 A 3PCS Z9 AP 1PCS Z9 B 3PCS Z9 BP 1PCS Z9 X 1PCS...
Страница 17: ...17 Top aluminum profiles frame assemble HM5x20 2 20 A2 Z9 B Z9 B Z9 A...
Страница 19: ...19 Assemble top aluminum profiles frame HM5x20 2 20 A2 Z9 B FRONT Back...
Страница 23: ...HM5x20 4 Z9 AP Z9 BP Z9 B Z9 A 23 Bottom aluminum profiles frame assemble 20 A2...
Страница 24: ...24 Install Rubber pads M5x10 4 Shim 5x10 4 Rubber pad 4 M5 board nut A3...
Страница 27: ...27 Install the top frame to Z axis profiles Step 1 HM5x30 4 Y axis Carrier Y axis Carrier A2...
Страница 28: ...28 Install the top frame to Z axis profiles Step 2 HM5x20 4 Top frame B2...
Страница 32: ...Install belts for X Y Left X motor Left idler Left Carrier Right Y Motor Right Carrier Right idler...
Страница 33: ...33 Assemble hot bed Bracket PM3x6 8 Hotbed bracket 2 PN Z9 2 A3 17...
Страница 34: ...34 Install hot bed 10x22 spring 4 hot bed M4 Hand nut 4 Connector toward the right back A3 1...
Страница 39: ...Photo of extrusion feeder and Z belt idler Z belt idler...
Страница 46: ...46 Pin out of ZRIBV6...
Страница 47: ...Wiring Diagram 47...
Страница 56: ...56 Improve Upgrade a laser engraving kit Scan to purchase Click to Know More...