System Check:
1)
Installers are required to perform a full functional check to
verify proper installation and operation. A complete functional
check includes Ground Traffic Control™ confirmation.
2)
Constant (RED wire) power check
A. Remove inline fuse on constant power (Red wire) and
measure voltage at red fuse holder.
3)
Switched power (White wire) power check
A. Power to this lead should only be present when the
engine is on and/or GPS tracking is desired. Wiring this
to constant power will lead to high and inaccurate idle
times.
B. Remove inline fuse on switched power (White wire) and
measure voltage at fuse holder:
Engine running = 8 to 30 VDC
Engine Off = 0 Volts
4)
Final check
A. Turn engine on for 4 minutes or more, then turn off engine.
B. In Zonar’s Ground Traffic Control™ export path CSV (GPS,
path report), ensure exported CSV contains:
1. Cold Start
2. Power-On event
3. Power-Off event
4. Idle Event (idles must be over 1 minute)
Note:
A proper and complete functional check requires the engine
to be running.
Contact Zonar at 1-877-843-3847 or by email at
[email protected] if you encounter any
issues or difficulties.
SYSTEM CHECK
11