7. EMERGENCY OPERATIONS
If any problems are noted on the unit, turn it off using the emergency shut-off device.
These emergency operations will generally be the result of some problem with the
electrical circuit, in which case you may have problems with the motors. You will therefore
need to disconnect the power to locate the fault, which may be inside the unit (short circuit)
or external to it (problems with the power supply, voltage variations, etc).
In the event of fire, it must be extinguished using suitable extinguishers. Extinguishers
should be appropriate for use on electrical fires.
8. PREVENTIVE MAINTENANCE
Preventive maintenance is a preset programme of checks that is followed regularly to
prevent equipment breakdowns.
The supplemental Building Facility Technical Regulations are applicable at all times to
maintenance standards, except when justified otherwise for technical reasons.
According to the equipment’s operating needs, it is crucial to make a list of those
elements that are needed to quick resolve equipment faults.
A maintenance log should record each component serviced during maintenance, as
well as activities performed or repairs made.
Maintenance staff must have access to a specific training programme.
Before starting maintenance operations on the unit, turn off the unit’s main switch.
Electrical shock can cause personal injury.
Keep the following in mind when performing maintenance operations.
8.1 MOTORS
Check the power consumption has not increased.
Periodically check the electrical connections are making good contact; this will
prevent breakdowns.
We recommend checking the fan mounting periodically.
8.2. FANS
Every three months, clean the dirt from the fan blades and bearings, since dirt can
not only reduce airflow but also lead to unbalanced operation and increase noise.
Periodically, test the airflow on each fan.
25
AIR PRO 500-800-1200
Содержание AIR PRO 1200
Страница 2: ......
Страница 4: ......
Страница 6: ......
Страница 15: ...15 AIR PRO 500 800 1200 5 6 1 ELECTRICAL PRINCIPLE AND CONTROL DIAGRAM 5 6 1 1 AIR PRO 500 ...
Страница 16: ...5 6 1 2 AIR PRO 800 ...
Страница 17: ...17 AIR PRO 500 800 1200 5 6 1 3 AIR PRO 1200 ...
Страница 22: ...5 8 1 DIAGRAM OF THE PRINCIPLE OF CONNECTION TO THE Z3D AIR QUALITY PROBE PAC500V PAC800V PAC1200V ...