5.6.2 CONNECTION PANEL DIAGRAM

5.6.2.1 ELECTRICAL AND CONTROL WIRING CONNECTION DETAIL

IMPORTANT: If the customer has NOT opted to purchase the probe, they do NOT 

have to touch ANYTHING on the terminal block that comes from the factory, 

that is, cables 18 and 20 have to go together (bridge mode). If the client HAS 

purchased the probe, they must separate cables 18 and 20 from the terminal strip 

for the correct operation of the equipment, in this way the probe will govern the 

equipment based on the air quality.

5.6.2.2 NOTICE DETAIL OF FILTER STATUS

The equipment has an integrated system (regardless of the probe) of leds that 

indicates the status of the filters, when the leds are off, the status of the filters 

is correct, when the leds turn red, it indicates that the filter must be changed. led 

filter on.

IMPORTANT NOTE: When changing the GRSystem filter (GRSV gas filter) you 

have to access the inside of the Electronic Control Board (PCB) (see situation in 

point 5.2.2.1) by unscrewing the front plastic cover and carry out the following 

action, press button P1 RESET CARBON/COAL continuously until the red alarm 

led is deactivated.

THE LIGHT ABOVE SHOW THAT THE INDICATED 

FILTER IS OVERFILLED. IN THAT CASE, FOR 

THE CORRECT WORK OF THE SYSTEM, PLEASE 

CONTACT YOUR DISTRIBUTOR TO REPLACE THEM.

GRSV       F7          G4         H14

FILTER

SUBSTITUTION

B

A

C

(A) Black cable = 230V power supply

(B) Upper gray cable = planned connection to the Z3D air quality sensorN 

for filter review notice, there are 2 cables marked with numbers 5 and 6 that 

correspond to the numbers where they have to be connected inside said probe.

(C) Lower gray cable = provision for connection to the Z3D air quality probe for 

purifier ON/OFF control based on indoor air quality limits, there are 2 cables 

marked with the numbers 18 and 20 that correspond to the numbers where 

they have to be connected inside said probe.

See diagrams point 5.8.1.

Содержание AIR PRO 1200

Страница 1: ...P A P A P 800 P 800 P 500 P 500 P 1200 P 1200 P 800 1200 800 P 800 P 1200 P 800 P AIR PRO 500 800 1200 USER MANUAL ZONAIR3D ...

Страница 2: ......

Страница 3: ...cerns over the constant and ever increasing deterioration of the quality of the air we breathe Air Pro is an air purification equipment specially designed for indoor spaces Its unique system filters and purifies polluted air transforming it into the best quality air free from contaminating particulate free from environmental ozone and with toxic irritating and carcinogenic gaseous pollutants reduc...

Страница 4: ......

Страница 5: ...1200 5 6 2 CONNECTION PANEL DIAGRAM 5 6 2 1 ELECTRICAL WIRING CONNECTION AND CONTROL DETAIL 5 6 2 2 FILTER STATUS NOTICE 5 7 MECHANICAL CONNECTION OF THE UNIT S AIR PRESSURE INTAKES______ 5 7 1 ELEMENTS POSITION AND PRESSURE INTAKES 5 7 2 CONNECTION DIAGRAM OF ELEMENTS AND SOCKETS PRESSURE 5 7 2 1 PRESSURE SWITCHES DIFFERENTIAL PRESSURE PROBE PCB 5 7 2 2 DIFFERENTIAL PRESSURE SENSOR ENGINES 5 8 CO...

Страница 6: ......

Страница 7: ...le for any damage or injury caused to persons or objects resulting from failure to comply with safety standards and any possible modifications to the product The EC seal and statement of conformity serve as a proof of the product s compliance with applicable European Community standards ZONAIR3D engineers are firmly comitted to research and development to achieve products with improved efficiency ...

Страница 8: ...ng If there is any damage to the unit or the shipment is not complete write down the problems on the delivery slip and send a claim to the carrier Also report any problems to Zonair3D ICON LABEL MEANING Caution the panel may fall once opened Caution cut off the power supply before removing the panel Caution risk of entrapment Air direction indication Rating plate of the unit Model Reference Serial...

Страница 9: ... support its weight This must not be installed under any circumstances in flammable or explosive environments such as environments loaded with oil vapors saline air or corrosive The installation of the equipment can be dangerous due to the material used the pressures in the system and the electrical components Because of this only trained and qualified personnel must install service or repair the ...

Страница 10: ... filter The following figure identifies the main components of the main module 5 2 1 INTERIOR COMPONENTS ABSOLUTE FILTER SECTION FAN SECTION PREFILTER GRSYSTEM SECTION Flujo de aire Flujo de aire Flujo de aire Mantenimiento ABSOLUTE FILTER FAN PREFILTER G4 GRSYSTEM GRSYSTEM FILTER TIGHTENING KNOBS LOBED ABSOLUTE FILTER TIGHTENING KNOBS LOBED L W H ...

Страница 11: ...14 1 SOCKET H14 4 INPUT H14 PRESSURE SWITCH 2 INPUT H14 PRESSURE SWITCH Maintenance Maintenance Air Flow Maintenance Maintenance 1 2 3 4 5 2 1 3 11 8 7 5 6 12 10 9 4 5 2 2 EXTERIOR ELEMENTS 5 2 2 1 WITH SIDE INSPECTION COVER 5 2 2 2 WITHOUT SIDE INSPECTION COVER PRODUCT RANGE FLOW m3 h MEASUREMENTS H X W X L mm POWER KW ELECTRICAL POWER SUPPLY WEIGHT Kg AIR PRO 500 500 310 x 972 x 1104 0 164 1F 23...

Страница 12: ...ment must allow space which is free of obstruction to be able to freely access the device for maintenance The space required will depend on the side of the device where the extraction is made The equipment is provided with registers to access the filters and fans 5 5 MOUNTING POSITION VERTICAL üüüüü Filters and fans maintenance PRODUCT RANGE AIR PRO 500 DIMENSIONS H x W x L mm 310x972x1104 AIR PRO...

Страница 13: ... 5 5 1 2 BENCH FLOOR MOUNTED For floor mounting you must Assemble the 4 brackets together with their screws in the 4 corners of the bench support equipment These brackets will NOT be used to join them to any type of anti vibration system The classic bench system is based on a support structure for the equipment which can be joined with the brackets mentioned in the previous point and said structur...

Страница 14: ...n is disconnected and that there is no voltage between the cables Once installed the device must comply with the following Directives Low Voltage Directive 2014 35 EU Safety in machines 2006 42 EC Electromagnetic Compatibility Directive CEM 2014 30 EU Ecodesign for fans EU 327 2011 Hazardous substances 2011 65 EU Once these operations have been carried out it is necessary to verify the tightening ...

Страница 15: ...15 AIR PRO 500 800 1200 5 6 1 ELECTRICAL PRINCIPLE AND CONTROL DIAGRAM 5 6 1 1 AIR PRO 500 ...

Страница 16: ...5 6 1 2 AIR PRO 800 ...

Страница 17: ...17 AIR PRO 500 800 1200 5 6 1 3 AIR PRO 1200 ...

Страница 18: ...RSystem filter GRSV gas filter you have to access the inside of the Electronic Control Board PCB see situation in point 5 2 2 1 by unscrewing the front plastic cover and carry out the following action press button P1 RESET CARBON COAL continuously until the red alarm led is deactivated THE LIGHT ABOVE SHOW THAT THE INDICATED FILTER IS OVERFILLED IN THAT CASE FOR THE CORRECT WORK OF THE SYSTEM PLEA...

Страница 19: ...system 1 H14 PRESSURE SWITCH 2 PCB Printed circuit board 3 ROTARY SWITCH 4 DIFFERENTIAL PRESSURE SENSOR5 5 G4 PRESSURE SWITCH 7 PRESSURE SOCKET G4 5 PRESSURE TAKE OFF G4 6 INPUT G4 PRESSURE SWITCH 8 INPUT G4 PRESSURE SWITCH 12 FRONT A G REGULATOR FLOW 10 BACK A G REGULATOR FLOW 9 ENGINE PRESSURE TAKE OFF 11 ENGINE PRESSURE SOCKET 3 SOCKET H14 1 SOCKET H14 4 INPUT H14 PRESSURE SWITCH 2 INPUT H14 PR...

Страница 20: ...5 7 2 CONNECTION DIAGRAM OF ELEMENTS AND PRESSURE PORTS 5 7 2 1 PRESSURE SWITCHES DIFFERENTIAL PRESSURE PROBE PCB PAC500V PAC800V PAC1200V ...

Страница 21: ...CONNECTION TO THE Z3D INDOOR AIR QUALITY PROBE Only the probe provided by the Z3D manufacturer can be connected This probe has several functionalities ON OFF of the equipment depending on the quality of the indoor air Link with the PCB of the equipment for general notification of change of filters ...

Страница 22: ...5 8 1 DIAGRAM OF THE PRINCIPLE OF CONNECTION TO THE Z3D AIR QUALITY PROBE PAC500V PAC800V PAC1200V ...

Страница 23: ...earing structure for the ducts The connection of the equipment to the air ducts must be made by means of flexible connections to avoid the transmission of vibrations to the installation It will be checked that the air inlet and outlet are not obstructed or there is any obstacle that prevents its good circulation If these requirements are not met the efficiency of the system will suffer 23 AIR PRO ...

Страница 24: ...tage indicated on the characteristics plate The fan will not start if the network of ducts is not completely closed since connecting the fan without load can cause over currents that could damage the motor This same effect can occur if the requested static pressure is greater than the pressure drop produced in the duct network To solve this case act on the flow regulation dampers by closing them s...

Страница 25: ...rds except when justified otherwise for technical reasons According to the equipment s operating needs it is crucial to make a list of those elements that are needed to quick resolve equipment faults A maintenance log should record each component serviced during maintenance as well as activities performed or repairs made Maintenance staff must have access to a specific training programme Before st...

Страница 26: ... efficiency 8 3 2 REPLACING THE FILTERS To replace the filters it is recommended to use PPE individual protection equipment FFP2 mask gloves and goggles To extract the filter open the corresponding inspection register and proceed to extract it by sliding the filter outwards The high efficiency filters from H14 are provided with an anchoring system using knobs To remove it you must turn the upper a...

Страница 27: ... Czech Republic Denmark Estonia Finland France Germany Greece Hungary Italy Latvia Liechtenstein Lithuania Luxembourg Malta Netherlands Norway Poland Portugal Republic of Ireland Romania Slovakia Slovenia Spain Sweden and Switzerland However this clause shall apply notwithstanding any limitations and conditions that may apply to the warranty in the country in which it is exercised provided the pro...

Страница 28: ...ccepted as proof The consumer must contact the company within the period indicated above through the following contact details ZONAIR3D C CERDANYA 7 08140 CALDES DE MONTBUI BARCELONA SPAIN Tel 34 93 551 03 40 Website www zonair3d com E mail zonair3d zonair3d com C EXCLUSIONS The installation or de installation of the product as well as all periodic servicing or maintenance work are expressly exclu...

Страница 29: ...ent services parts articles applications installations repairs external wiring or connectors not supplied or authorised by Zonair3DTM e Damage caused by connections to improper power line current voltage surges or fluctuations f Damage caused by not handling or maintaining the product in accordance with the instructions provided by Zonair3DTM g Damage caused by normal wear and tear of the product ...

Страница 30: ...P A P A P 800 P 800 P 500 P 500 P 1200 P 1200 P 800 1200 800 P 800 P 1200 P 800 P AIR PRO 500 800 1200 ZONAIR3D ...

Отзывы: