- 20 -
1.In order to resist rust before machine head packing,all parts are smeared with thick mst-resist ant oil.
After packing,perhaps in a relativey long storage and transportation period,the oil will harden and
absorb dusts.Therefore,it's necessary to clean the oil and dusts with neat soft cloth and gasoline.
2.The machine are examined and checked thoroughly before leaving the factory.But in a long
jouney, the machine may be shaken intensely and some parts become loose. It's advisable to
test again and tum the driving gears with hands so as to make sure if turning is difficult, run foul of
each other or if there is non-uniform block or irregular voice. If so,the machine should be adjusted
until every part is normal before driving.3.Operation are forbidden before pouring oil in the plate.
4.When the machine is in operation,the direction of the upper wheel are anti-clockwise(viewing from
the outer part of the upper wheel).
5.Connrom the given electric voltage and phase on motor nameplate.
6.The date of manufacture is shown on the inspection certification.
l.When the power supply is open or the machine is operating,don't touch the machine needle with your
hands.
2.When the machine is running ,don't stretch your hands in the mat of the thread stitch bar.
3.When the machine head is turning and the "V"belt is being disassembled,the electric supply should
be cut off.
4.When the operator is leaving the machine,cut out the power supply.
5.When the machine is running,no heads,hands or any other things are allowed to get close to the uper
wheels,"V"belts bobbin winder and motor.
6.Not until the machine stops running can you disassemble the belt cover,protection cover or other
protecting devices?
7.The machine head's surface can't be cleaned with dilutes such as banana oil.
8.Don't put your finger into the finger guard when you feed material by hand.
Standard typical
Small rotary hook
Thick materials
Big rotary hook
Thick materials
Sewing material
Light-middle thick
materials
Middle thick~thick
materials
Mid thick~thick
materials
Sewing speed(MAX)
5000S.P.M
3000S.P.M
3000S.P.M
Maximum stitch length
5mm
5mm
5mm
Pressure foot liftting
high
10mm(standard)
13mm(standard)
NEEDLE
DB×1 9#~18#
DP×5 16#~18#
DP×5 20#~23#
Lukr cant oil
10# White oil
Motor power
220V/550W
220V/550W
1.Before operation
2.Operation precautions
3.Chief technical specifications
Содержание ZJ9700
Страница 1: ......
Страница 24: ......
Страница 42: ...一 四排齿中厚料 1 机壳分组件 MACHINE FACHINE FRAME MISCELLANEOUS COVER COMPONENTS 36 ...
Страница 45: ...2 上轴挑线分组件 机头无油 MAIN SHAFT THREAD TAKE UP COMPONENTS 39 ...
Страница 48: ...2 上轴挑线分组件 头部有油 MAIN SHAFT THREAD TAKE UP COMPONENTS 42 ...
Страница 51: ...3 针杆夹线分组件 NEEDLE BAR THREAD TENSION COMPONENTS 45 ...
Страница 53: ...4 压料 松线分组件 PRESSER BAR TENSION RELEASE COMPONENTS 47 ...
Страница 56: ...5 勾线分组件 HOOK OF DRIVING SHAFT COMPONENTS 50 ...
Страница 58: ...6 送料分组件 FEED MECHANISM COMPONENTS 52 ...
Страница 60: ...7 送料调节分组件 FEED REGULATING COMPONENTS 54 ...
Страница 63: ...8 1 剪线分组件 THREAD TRIMMER COMPONENTS 旋刀组件 ROUND KNIFE COMPONENTS 57 ...
Страница 66: ...8 2 剪线分组件 THREAD TRIMMER COMPONENTS 平刀组件 STRAIGHT KNIFE COMPONENTS 60 ...
Страница 69: ...9 1 拨线分组件 WIPER COMPONENTS 63 ...
Страница 71: ...9 2 夹线组件BOBBIN THREAD TENSION COMPONENTS 65 ...
Страница 73: ...10 润换分组件 LUBRICATION COMPONETS 67 ...
Страница 75: ...11 油盘 膝提抬压脚分组件PRESSER FOOT COMPONENTS OIL PLATE KNEE LIFE 69 ...
Страница 77: ...12 过线架分组件 COMPONENTS OF THREAD RUNNING STAND 71 ...
Страница 79: ...13 附件 ACCESSORIES 73 ...
Страница 81: ...二 三排齿中厚料专用件 SPECICAL PARTS OF THREE ROWS FEED DOGS AND MIDDLE THICK MATERIALS 75 ...
Страница 83: ...三 厚料专用件 1 SPECICAL OF CHICK MATERIALS 1 77 ...
Страница 85: ...三 厚料专用件 2 SPECICAL OF CHICK MATERIALS 2 79 ...