RECOMMENDED INSTALLATION FOR ALL APPLICATIONS
PERFORMANCE DATA
(1) Electrical wiring and protection must be in accordance with National
Electrical Code and any other applicable state and local electrical
requirements.
(2) Install proper Zoeller unicheck (combination union and check valve),
preferably just above the basin (indoor installations) to allow easy
removal of the pump for cleaning or repair. If high head or below cover
installation is required use 30-0164 on 1-1/2" (DN40) pipe, 30-0152 on
2" (DN50) pipe and 30-0160 on 3" (DN80) pipe.
(3) All installations require a basin cover to prevent debris from falling into
the basin and to prevent accidental injury.
(4) When a Unicheck is installed, drill a
3
/
16
" (5 mm) dia. hole in the
discharge pipe even with the top of the pump.
NOTE: THE HOLE
MUST ALSO BE BELOW THE BASIN COVER AND CLEANED
PERIODICALLY.
(High Head unit see #3 under “Caution” on front page).
Water stream will be visible from this hole during pump run periods.
(5) Securely tape or clamp power cord to discharge pipe, clear of the float
mechanism(s).
(6) Use full-size discharge pipe.
(7) Basin must be in accordance with applicable codes and
specifications.
(8) Pump must be level and float mechanism(s) clear of sides of basin before
starting pump.
(9) Basin must be clean and free of debris after installation.
(10) Gate Valve or Ball Valve to be supplied by installer and installed
according to any and all codes.
(11)
For nonautomatic pumps, locate float switches as shown in sketches. The
best place for the “off” point is above the motor housing and positioned
180° from the inlet. Never put “off” point below discharge on pump
(12) Gas tight seals required to contain gases and odors.
(13) Vent gases and odors to the atmosphere through vent pipe.
All installations must comply with all applicable
electrical and plumbing codes.
VENT
BASIN LID
TAPE OR CLAMP
BASIN
FULL SIZE DISCHARGE PIPE
10 cm (4") OF GRAVEL
UNICHECK
GATE OR BALL VALVE
GAS TIGHT SEALS
GRINDER PUMP
3/16" (5 mm)
DIA.
WEEP HOLE
PIGGYBACK FLOAT
3
1
7
6
2
10
12
5
13
8
4
11
9
SK3108
TYPICAL FLOAT HANGER ON STEEL COVER PITS
ACCESS COVER
STANDARD PIPE
FLANGE
PVC OR LIGHT WEIGHT
STAINLESS STEEL PIPE
PEA GRAVEL
SK1217
On some installations it may be desirable to install an independent hanger
for the level control switches to avoid possible hang ups on the pumps,
piping, valves, etc. Float hangers are available from Zoeller Company on
Catalog Sheet FM0526 or can be fabricated from standard pipe and fittings.
INSTALLATION SKETCHES
153604
TOT
AL
DYNAMIC HEAD
FLOW PER MINUTE
15
LITERS 0
GALLONS
20
40
5
10
0
2
5
25
100
80
60
20
50
TOTAL DYNAMIC HEAD/FLOW
PER MINUTE
SEWAGE
PUMP PERFORMANCE CURVE
MODEL 803/805/807
FEET
METERS
4
10
15
6
20
35 ft. (10.7 m)
22
83
Gal.
Liters
35
31
132
117
803
45
40
35
30
25
30
35
120
140
160
180
8
10
9
34
40
45
50
55
45 ft. (13.7 m)
29
110
Gal.
Liters
40
37
151
140
805
20
76
55 ft. (16.8 m)
35
132
Gal.
Liters
45
42
170
159
807
27
102
--
--
--
--
--
--
8
30
7
26
18
68
60
12
14
16
18
Shut-off Head:
20
6.1
Feet
Meters
5
10
1.5
3.0
MODEL
30
9.1
50
15.2
40
12.2
803
805
807