SINGLE PHASE WIRING INSTRUCTIONS

 FOR YOUR PROTECTION, ALWAYS DISCONNECT PUMP FROM ITS POWER SOURCE BEFORE HANDLING

.  Single phase pumps 

are supplied with a 3-prong grounded plug to help protect you against the possibility of electrical shock. 

DO NOT UNDER ANY CIRCUMSTANCES 

REMOVE THE GROUND PIN.

  The 3-prong plug 

must 

 be inserted into a mating 3-prong grounded receptacle. 

If

 the installation does not have such 

a receptacle, it must be changed to the proper type, wired and grounded in accordance with the National Electrical Code and all applicable local codes 

and ordinances.

 “Risk of electrical shock”  

Do not remove power supply cord and strain relief or connect conduit directly to the pump.

 Installation and checking of electrical circuits and hardware should be performed by a qualified licensed electrician.

 Units supplied without a plug (single and three phase) and single phase nonautomatic units with a 20 amp plug must have a motor control 

and liquid level control provided at time of installation. The control device should have suitable voltage, ampere, frequency, grounding and horsepower 

rating for the pump to which it is connected.

NONAUTOMATIC

WIRING DIAGRAM

AUTOMATIC

WIRING DIAGRAM

153224

153223

1.  All power circuits must be disconnected and locked out before any 

attempts are made at servicing. The cutter rotor and disc can be removed 

and sharpened by grinding the cutting faces. Both rotor and disc must be 

removed from the pump. Removal of these parts can be accomplished in the 

field by removing pump from the sump and positioning horizontally to access 

the intake of the pump. If seals or other repairs are required, the pump must 

be totally removed and serviced in a shop by a qualified pump technician or 

authorized service center.

2.  Thoroughly clean the cutter rotor and disc assembly. Tilt pump back to the 

vertical position to make certain the end play has been removed. Check 

and record the clearance between the rotor and disc with a feeler gage. 

The correct running clearance is between 0.003" (0.076 mm) and 0.008” 

(0.203 mm).

3.  With pump in horizontal position, heat the hex head bolt in the center of the 

rotor with a propane torch. The bolt must be heated to 350° F (177° C) to 

soften the thread lock sealer on the bolt for ease of removal. Remove the 

bolt by turning in a counterclockwise rotation. It will be necessary to use a 

wood block to prevent the rotor from turning while removing the bolt. Pull 

rotor from the shaft and remove the spacer shims located behind the rotor.

4.  Remove the screws holding the disc and remove disc from the pump.
5.  The disc and the rotor cutter can be replaced with new service parts or 

resurfaced by grinding. Resurfacing is accomplished by surface grinding 

both  disc  and  rotor  to  a  32  micro  finish.  Do  not  attempt  grinding  in  the 

field. Send parts to a qualified machine shop or return to the factory for 

repair. The disc, rotor and shims are a matched set. Keep parts together. 

Measure disc before and after resurfacing with micrometer and record 

measurements. 

6. 

After resurfacing, the disc and rotor must be flat within 0.001” (0.025 mm). 

If the disc has been surface ground, it will be necessary to remove shims 

to compensate for the material removed from the disc plus any amount 

over 0.008” (0.203 mm) measured in the field (step 2, above) before the 

rotor and disc were disassembled from the pump. The shim thicknesses 

and disc should be measured with a micrometer and the amount removed 

from the disc plus any clearance over 0.008” (0.203 mm) must match the 

shim thickness being removed.

7.  Clean bottom of pump where disc is located and replace disc and retainer 

screws. Replace rotor with the correct shims. Install washer and torque to 

30 in.-lbs. apply Loctite 262 thread-lock sealant or equal to bolt threads 

prior to insertion. Check running clearance with pump in vertical position 

to remove end play. Clearance must be between 0.003" (0.076 mm) and 

0.008” (0.203 mm) to obtain efficient grinding when the pump is put back 

in service. 

8.  Check the oil in the motor housing on 803/805/807 pumps before 

reinstalling. The level should be even with the fill plug when pump is in 

the upright position. Add oil if required. Use insulating oil supplied by the 

factory. 

REPAIRS

These are the original installation instructions.

MOTOR

RUN

OVERLOAD

START

FLOAT

RELAY

1

2

5

4

2

1

3

SWITCH

COM

NC

L1 - BLACK

GREEN

L2 - WHITE

WHITE

BLACK

WHITE

START CAPACITOR

(1)  BLUE

(2)  RED

(3)  YELLOW

BLACK

(1)  BLUE

(2)  RED

(3)  YELLOW

BLACK

RUN CAPACITOR

MOTOR

RUN

OVERLOAD

START

RELAY

1

2

5

L1 - BLACK

GREEN

L2 - WHITE

WHITE

WHITE

START CAPACITOR

(1)  BLUE

(2)  RED

(3)  YELLOW

BLACK

(1)  BLUE

(2)  RED

(3)  YELLOW

BLACK

RUN CAPACITOR

Содержание SHARK 803

Страница 1: ...ing or removing cutter 1 ZoellerGrinderPumpsaredesignedforgrindingandpumpingsewagefromhomes The pump is intended to grind and pump all normal sewage including reasonable quantities ofdisposablediapers sanitarynapkins papertowels rubbermaterials cleaningwipes plastics cigarette butts and other items normally found in sewage 2 Check to be sure your power source is capable of handling the voltage req...

Страница 2: ...NOT install on sand gravel or dirt 4 DO be sure that the area is large enough to allow proper clearance for the level control switch es to operate properly 5 DO Always Disconnect Pump From Power Source Before Handling DO always connect to a separately protected and properly grounded circuit DO NOT ever cut splice or damage power cord Only splice in a watertight junction box DO NOT carry or lift pu...

Страница 3: ...ny and all codes 11 For nonautomatic pumps locate float switches as shown in sketches The best place for the off point is above the motor housing and positioned 180 from the inlet Never put off point below discharge on pump 12 Gas tight seals required to contain gases and odors 13 Vent gases and odors to the atmosphere through vent pipe All installations must comply with all applicable electrical ...

Страница 4: ... 177 C to soften the thread lock sealer on the bolt for ease of removal Remove the bolt by turning in a counterclockwise rotation It will be necessary to use a wood block to prevent the rotor from turning while removing the bolt Pull rotor from the shaft and remove the spacer shims located behind the rotor 4 Remove the screws holding the disc and remove disc from the pump 5 The disc and the rotor ...

Страница 5: ...alivio de tensión y no conecte un conductor directamente a la bomba Si está dañado el cable eléctrico se debe reemplazarlo un representante authorizado por Zoeller 9 La bomba contiene aceite lo que se pone presurizado y caliente cuando funcione Permita 2 1 2 horas después de desconectar la bomba antes de manipularla 10 No use la bomba para agua potable porque el aceite en la bomba lo puede contami...

Страница 6: ...amente cuando hay una caja de conexión hermética NO transporte o levante la bomba por su cable de alimentación eléctrica NO use un cable de extensión 6 INSTALE una válvula de retención y una unión en la tubería de descarga NO use una tubería de descarga de menor tamaño que la descarga de la bomba 7 NO esta unidad para bombear gasolina u otros líquidos peligrosos 8 PRUEBE la bomba inmediatamente de...

Страница 7: ...e los interruptores de flotador es como se muestra en los esquemas El punto off apagado debe estar por encima de la carcasa del motor y a 180 de la entrada Nunca ubicar el punto off débajo de la entrada de la bomba 12 Los sellos herméticos contra gases son necesarios a fin de contener los gases y olores 13 Ventile los gases y olores a la atmósfera a través del tubo de ventilación Todas las instala...

Страница 8: ...un centro de servicio autorizado 2 Limpie a fondo el cortador en forma de estrella y el conjunto de disco de acero inoxidable Incline la bomba hacia atrás hacia la posición vertical para asegurarse de que juego axial haya sido retirado Compruebe y registre la separación entre el rotor y el disco con una lámina calibradora La separación de funcionamiento correcta es entre 0 076 mm 0 003 pulg y 0 20...

Страница 9: ...rocution L usage de ce type de pompe dans une piscine de natation et des zones marines n a pas été étudié 12 Il ne faut pas essayer de tourner avec les doigts le couteau qui se trouve au fond de l appareil Utiliser une clé mâle pour vérification et la dépose du couteau SE RÉFÉRER À LA GARANTIE EN PAGE 10 AVERTISSEMENT VOIR PLUS BAS POUR LA LISTE DES AVERTISSEMENTS VOIR PLUS BAS POUR LA LISTE DES M...

Страница 10: ...rs brancher la pompe sur un circuit séparé mis à la terre IL NE FAUT JAMAIS couper faire une épissure ou endommager un cordon d alimentation Pour faire une raccordement il faut utiliser un boîtier de raccordement étanche IL NE FAUT PAS utiliser le cordon d alimentation pour transporter ou soulever la pompe IL NE FAUT PAS utiliser de rallonge 6 IL FAUT installer un clapet de sécurité et un raccord ...

Страница 11: ...strations Le point d arrêt doit être au dessus du carter du moteur et à 180 de l admission Le point d arrêt ne se doit trouver jamais au dessous du refoulement de la pompe 12 Pour éviter la propagation des gaz et des odeurs toutes les installations doivent avoir des joints étanches 13 Les gaz et les odeurs sont évacués à l atmosphère au moyen d un tuyau d évent Toutes les installations doivent êtr...

Страница 12: ...ttoyer soigneusement le rotor et le disque Incliner la pompe à la verticale pour s assurer que le jeu axial a été retiré Vérifier et noter le dégagement entre le rotor et le disque à l aide d une jauge d épaisseur Le jeu de fonctionnement approprié est entre 0 076 mm 0 003 po et 0 203 mm 0 008 po 3 Une fois la pompe dans la position horizontale chauffer le boulon à tête hexagonale au centre du rot...

Отзывы: