background image

5

4

© Copyright 2019 Zoeller

®

 Co. All rights reserved.

© Copyright 2019 Zoeller

®

 Co. All rights reserved.

9

8

7

11

12

13

14

15

16

3

1

2

4

10

5

6

6

202-C

202-A & B

Service Parts

QWIK JON

®

 ULTIMA

202-A & B

202-C

202-D

10/06 thru

5/16

6/16 thru

Current

6/18 thru 

Current

Item

Description

Part No.

Part No.

Part No.

1

Qwik Jon

®

 Ultima sewage removal system

202-1000

202-1000

202-1000

2

Replacement pump with discharge pipe

017374

017374

155546

3

Tank cover with discharge fittings

017373

017373

017373

4

Tank

018500

018500

018500

5

Seal

017350

017350

017350

6

Float switch assembly/ piggyback foat style

018501

018501

N/A

Float switch hardware assembly

N/A

N/A

155581

7

Toilet bowl

202-2000

202-2000

202-2000

8

Toilet tank with cover 1.6 GPF (6.1 LPF) (left handed)

202-3000

N/A

N/A

Toilet tank with cover 1.6 GPF (6.1 LPF) (right handed)

202-3001

N/A

N/A

Toilet tank with cover 1.28 GPF (4.8 LPF) (left handed)

N/A

202-3002

202-3002

Toilet tank with cover 1.28 GPF (4.8 LPF) (right handed)

N/A

202-3003

202-3003

9

Toilet tank cover

150012

154032

154032

10

Rubber coupling with hose clamps

151563

151563

151563

11

Extension kit for behind the wall installation

10-3050 

10-3050 

10-3050 

12

Tank-to-toilet hardware

017360

154048

154048

13

Flush valve replacement kit - 1.6 GPF (6.1 LPF)

150658

N/A

N/A

Flush valve replacement kit - 1.28 GPF (4.8 LPF)

N/A

152587

152587

14

Fill valve assembly with tube - 1.6 GPF (6.1 LPF)

150823

N/A

N/A

Fill valve assembly with tube - 1.28 GPF (4.8 LPF)

N/A

152588

152588

15

Flush valve assembly

150824

154029

154029

16

Flapper with clip and chain

150825

N/A

N/A

SK2605

Condition

Possible Cause

Remedy

PUMP WILL NOT START OR RUN.

Low voltage, blown fuse, open circuit

Have a qualified electrician check fuse and 

circuit.

Impeller bound

Contact a Zoeller Service Center.

Motor or wiring shorted

Debris on float switch

Remove debris

PUMP STARTS TOO SOON.

Float “ON” point is adjusted too low

Raise the float stops, make sure the float is 

between the two stops. 

WATER LEVEL EXCESSIVE BEFORE PUMP 
TURNS ON.

Float “ON” point adjusted to high

Lower the upper float stop.

PUMP WILL NOT SHUT OFF OR RUNS TOO LONG 
BEFORE WATER IS PUMPED.

Pump not plugged into piggyback float 

switch receptacle

Ensure pump is not plugged directly into 

the outlet. Plug pump into piggyback 

float switch receptacle.

Debris under float

Remove debris from around float.

Faulty float switch

Contact a Zoeller Service Center.

Float “OFF” point adjusted too low

Raise the lower float stop.

Pump is air locked

Make sure vent hole in discharge pipe is 

clear.

Water level too low

Raise the lower float stop.

Waste material has accumulated 

blocking flow of material

Hold flush handle down on toilet for 15 

seconds. If unit will not clear, unplug 

and wait 30 minutes. Plug unit back in 

and repeat. If unit still will not turn off, 

it will need to be opened and the debris 

relocated.

PUMP OPERATES BUT DELIVERS LITTLE OR 
NO WATER.

Debris around intake

Clean area around intake.

Blockage in discharge pipe

Remove pipe and flush out debris.

Low or incorrect voltage

Have a qualified electrician check house 

wiring.

Damaged Impeller

Contact a Zoeller Service Center.

Incorrect float adjustment

Contact Product Support Department.

Pump is air locked

Make sure vent hole in discharge pipe 

is clear.

Vertical lift too high

Change discharge piping or contact 

Product Support Department.

 

Before servicing a pump, always shut off the 

main power breaker and then unplug the pump - making 

sure you are not standing in water and are wearing 

insulated protective sole shoes. Under flooded conditions, 

contact your local electric company or a qualified licensed 

electrician for disconnecting electrical service prior to pump 

removal.

 

 Submersible pumps contain oil which become 

pressured and hot under operating conditions.

 

Allow 2-1/2 hours 

after disconnecting before attempting service.

If the above checklist does not solve the problem, consult Zoeller 

Product Support Department 1 (800) 928-7867 or 1(502) 778-2731- 

Do 

not

 attempt to service or otherwise disassemble pump. 

CAUTION

 

Do not dispose of feminine sanitary products, 

disposable diapers, dish rags, etc. in the QWIK JON

®

 ULTIMA . They 

may jam the pump or other plumbing lines and cause malfunction. 

CARE OF FINISH:

 Soap and water is all that is recommended for 

cleaning the outside of the tank. Other cleaning products may 

cause discoloration and scratching.

Содержание QWIK JON ULTIMA 202 Series

Страница 1: ...e the amperage requirements of the motor as indicated on the pump or name plate NOTICE TO INSTALLER Instructions must remain with installation FM2369 0819 Supersedes 0518 P N 018507 MODEL NO ____________________ DATE CODE __________________ DATE INSTALLED _____________ SEE BELOW FOR LIST OF WARNINGS Product information presented here reflects conditions at time of publication Consult factory regar...

Страница 2: ...ationinthespace providedonthefrontofthismanual Refertothisinformationwhencalling factory Do s And Don ts For Installing A Unit 1 DO read all installation material with the unit 2 DO inspectunitforanyvisibledamagecausedbyshipping Contactdealer if unit appears to be damaged 3 DO clean all visible debris from the unit 4 DO always disconnect pump from power source before handling DO always connect to ...

Страница 3: ... WILL NOT SHUT OFF OR RUNS TOO LONG BEFORE WATER IS PUMPED Pumpnotpluggedintopiggybackfloat switch receptacle Ensure pump is not plugged directly into the outlet Plug pump into piggyback float switch receptacle Debris under float Remove debris from around float Faulty float switch Contact a Zoeller Service Center Float OFF point adjusted too low Raise the lower float stop Pump is air locked Make s...

Страница 4: ...VE SOLD SEPARATELY SK2588 STEP 2 Leveling of Pump Unit CAUTION Do not use wooden shims to level the pump unit CAUTION Ensure that nails screws or other sharp objects do not puncture the pump unit Level the pump unit to within 1 8 3 mm using hydraulic cement or similar material SK2589 NOTES a Do not use pipe dope on any plastic or rubber parts b Be careful when tightening bolts or nuts against chin...

Страница 5: ...ermit 2 While dry fitting the discharge pipe position and mark the location of the pump unit discharge fitting 3 Cut and dry fit 1 1 2 DN40 vent pipe as required to ensure that the vent pipe does not interfere with other components Make the connection to the pump unit with the provided street elbow A 2 x 1 DN50 x DN25 90 discharge fitting and a 1 1 2 DN40 street elbow vent fittinghavebeenprovidedf...

Страница 6: ...a instalación y el servicio de los circuitos eléctricos y aditamentos deberá hacerla un electricista debidamente calificado y certificado 7 Asegúrese de que la fuente de energía eléctrica sea capaz de manejar lose requisitos de amperaje del motor según se indica en la placa de indentificación de la bomba VER ABAJO LA LISTA DE ADVERTENCIAS INSTRUCCIONES DE SEGURIDAD LISTA DE CONTROL PREVIA A LA INS...

Страница 7: ...a 3 RETIRE todos los desechos visibles que tenga la unidad 4 DESCONECTE siempre la bomba de la fuente de poder antes de manipularla CONÉCTELA siempre a un circuito independiente debidamente aterrizado y protegido mediante un interruptor de circuito por falla a tierra NO corte empalme ni dañe nunca el cable de alimentación NO cargue ni levante la bomba jalándola del cable de alimentación NO use ext...

Страница 8: ...Use calzado con suela protectora aislante y asegúrese de no estar pisando agua En caso de inundación comuníquese con la compañía eléctrica local o con un electricista debidamente calificado y autorizado para desconectar el suministro eléctrico antes de sacar la bomba ADVERTENCIA Lasbombassumergiblescontienenaceitesquesepresurizan ycalientanbajocondicionesdeoperación Dejequetranscurran2 1 2horas de...

Страница 9: ...los derechos reservados Guía de referencia rápida del sistema Qwik Jon Ultima PASO 1 Seleccione la ubicación Planee su nueva instalacion con cuidado Piso La instalación requiere de un piso nivelado de estructura sólida con una pendiente no mayor a 3 mm 1 8 pulg Si el piso no está parejo use cemento hidráulico u otro material similar para nivelarlo Agua El inodoro requiere de un suministro de agua ...

Страница 10: ...or o el deslizador de DN40 1 1 2 pulg diámetro interno Esnecesarioperforarlaparteinternadeestospuntosdeentrada con ayuda de una sierra perforadora de 44 mm 1 3 4 pulg De esta manera se evitan problemas de fugas en los puntos de entrada que no se estén usando Al utilizar los puntos de entrada laterales instale una válvula de retención en la línea de entrada SK2591 PUNTO DE PERFORACIÓN DESLIZADOR DE...

Страница 11: ...aga los ajustes necesarios 6 Conecte el cable de alimentación de la bomba en el receptáculo del interruptor integrado y luego conecte el interruptor integrado al tomacorriente GFCI 7 Accione el inodoro y observe si funciona correctamente Espere a que se oiga el ruido de la bomba en funcionamiento Para que el inodoro funcione es necesario que la ventilación sea adecuada Revise que no haya fugas 8 R...

Отзывы: