Zoeller 7020 Скачать руководство пользователя страница 4

4

© Copyright 2020 Zoeller

®

 Co. All rights reserved.

PUMP WIRING INSTRUCTIONS

   FOR YOUR PROTECTION, ALWAYS DISCONNECT THE PUMP FROM ITS POWER SOURCE BEFORE HANDLING.  

 

  

All electrical connections must be wired and grounded in accordance with the National Electrical Code and all applicable local codes  

 

 

 

and ordinances.

    

 

Risk of electrical shock.

 Do not remove the power supply cord and strain relief or connect conduit directly to pump.

 

 

 

Installation and checking of electrical circuits and hardware should be performed by a qualified, licensed electrician.

254 mm (10") MAX.

127 mm (5") MIN.

FIGURE 2  Pump Control Switch Installation

Use the diagram above to secure the float switch properly and obtain the proper tether to customize the on-off cycle to each application. Note 

the minimum off level shown above.  On Prepackaged Systems, the tether length is set at 5”.

NOTE:

 Failure to keep within proper tether 

limits may prevent reliable switch operation.

NOTE

: Cable must be mounted in horizontal 

position.

Determining Pumping Range

in Inches (1 inch - 2.5 cm)

Use only as a guide. Due to weight of 

cable, pumping range above horizontal 

is not equal to pumping range below 

horizontal. Ranges are based on testing 

in nonturbulent conditions. Range may 

vary due to water temperature and cord 

shape. As tether length increases, so 

does the variance of the pumping range.

Tether Length (inches) 

10

Pumping Range (GPM) 

13.5

min.

max.

SK305D

SK2651

ALARM FLOAT

PUMP CONTROL

FLOAT TREE

FLOAT

406 mm (16")

MIN. OFF

Electrical Data

Amps

KVA

Code

Winding

Resistance

Line-to-Line

Model

BHP

RPM

Voltage

Phase

Hertz

Full Load

Shut Off

Locked

Rotor

E7020

1

1750

230

1

60

7.0

7.0

24.5

G

2.3 / 2.0*

E7021

2

1750

230

1

60

10.5

10.5

44.0

B

1.80 / 1.60*

RE & RWD7020

1

1750

230

1

60

7.0

7.0

24.5

G

**

RE & RWD7021

2

1750

230

1

60

10.5

10.5

44.0

B

**

I7021

2

1750

200

1

60

12

12

49.5

B

1.4 / 1.3*

RI & RWH7021

2

1750

200

1

60

12

12

49.5

B

**

 *   Line to line reading from the electrical load will only reflect the run winding resistance. Start winding resistance can only be measured after 

removing the cover.

**  Start and run winding resistance can only be measured after removing the cover and checking at through wall terminal.

FIGURE 3A  Models E7020, 

E7021 and I7021 

Wiring Diagram

002397

RUN

O.L.

MOTOR

(3)

BLUE

RED

WHITE

BLACK

GREEN

L1

L2

START

(1)

(2)

YELLOW

BLUE

RED

CAPACITOR

(WHITE)

(BLACK)

(BROWN)

FIGURE 3B  Models RE7020,

RE7021 and RI7021 Wiring Diagram

(6932 Replacement Grinder

Assembly w/ Manual Run)

152554

RUN

O.L.

MOTOR

(3)

BLUE

RED

GREEN

START

(1)

(2)

YELLOW

BLUE

RED

CAPACITOR

(WHITE)

(BLACK)

WHITE

BLACK

RED

YELLOW

BLUE

ORANGE

R

RELAY

4

6

0

1

R

2

6

4

5

GE RELAY

(BROWN)

1)

NOTES:

INSULATORS REQUIRED ON GE RELAY TERMINALS 2 & 5;

OMRON RELAY TERMINALS 1 & 4.

FIGURE 3C  Models RWD7020, 

RWD7021 and RWH7021 Wiring 

Diagram (6932 Replacement 

Grinder Assembly W/ Integral 

Pump And Alarm Floats W/ Manual 

Run)

153381

RUN

O.L.

MOTOR

(3)

BLUE

RED

START

(1)

(2)

YELLOW

(WHITE)

(BLACK)

(BROWN)

SWITCH

PUMP

SWITCH

ALARM

R

4

6

0

1

R

2

6

4

5

GE RELAY

BLUE

RED

CAPACITOR

WHITE

BLA

CK

RED

RELAY

YELLOW

BLUE

GREEN

ORANGE

BLUE

WHITE

BLA

CK

BLA

CK

WHITE

BLUE

RED

BLA

CK

WHITE

1)

NOTES:

INSULATORS REQUIRED ON GE RELAY TERMINALS 2 & 5;

OMRON RELAY TERMINALS 1 & 4.

Содержание 7020

Страница 1: ...nufacturer s recommendations Table of Contents Safety Instructions 1 Limited Warranty Checklist and Application 2 3 General Information 3 Pump Wiring Instructions 4 Typical Outdoor Prepackaged System 5 Installation and Operation Instructions 6 Maintenance 7 Service Checklist 8 MAIL TO P O BOX 16347 Louisville KY 40256 0347 SHIP TO 3649 Cane Run Road Louisville KY 40211 1961 502 778 2731 1 800 928 ...

Страница 2: ...1 Grinder Pumps can be retrofitted to existing positive displacement pump installations APPLICATIONS PREINSTALLATION CHECKLIST 1 Inspectyourprogressingcavitygrinderpump Iftheunithasbeendamaged in shipment contact your dealer before installing Do Not remove the test plugs in the cover or the motor housing 2 Carefullyreadallliteraturetofamiliarizeyourselfwithdetailsregarding installation and use Ret...

Страница 3: ...ressing cavity grinder pump is an intermittent duty pump designedforpumpingsanitarysewage Itisnotadewateringortrash pump 018330ZEP 0 2 4 6 8 10 12 14 16 0 20 40 60 80 100 120 140 160 180 200 260 PUMP PERFORMANCE CURVE MODEL 7020 7021 8 16 24 32 40 48 56 64 GALLONS LITERS METERS FEET TOTAL DYNAMIC HEAD FLOW PER MINUTE 220 240 72 20 40 60 10 20 30 40 50 60 70 80 90 100 110 0 PSIG TOTAL DYNAMIC HEAD ...

Страница 4: ...6 MIN OFF Electrical Data Amps KVA Code Winding Resistance Line to Line Model BHP RPM Voltage Phase Hertz Full Load Shut Off Locked Rotor E7020 1 1750 230 1 60 7 0 7 0 24 5 G 2 3 2 0 E7021 2 1750 230 1 60 10 5 10 5 44 0 B 1 80 1 60 RE RWD7020 1 1750 230 1 60 7 0 7 0 24 5 G RE RWD7021 2 1750 230 1 60 10 5 10 5 44 0 B I7021 2 1750 200 1 60 12 12 49 5 B 1 4 1 3 RI RWH7021 2 1750 200 1 60 12 12 49 5 B...

Страница 5: ...L VALVE ALARM FLOAT PUMP CONTROL FLOAT 12 30 4 cm MIN OFF LEVEL FIBERGLASS BASIN 1 8 3 mm 302 STAINLESS STEEL LIFTING CABLE 1 1 4 FLEXIBLE DISCONNECT FITTING 1 1 4 BULK HEAD DISCHARGE FITTING 24 60 9 cm SOLID FIBERGLASS COVER GROMMET SEAL 4 INLET W SEAL FIELD INSTALLED MINIMUM 60 152 cm DISCHARGE HOSE HIGH WATER ALARM NOT INCLUDED WATERTIGHT QWIK BOX NOT INCLUDED FLOAT TREE 48 122 cm 72 183 cm 1 1...

Страница 6: ...in installation reference guide on more specific requirements 11 Note The progressing cavity grinder basin is a sewage holding tank Vent connection should be installed in accordance with all national state and local plumbing codes 12 Dig a trench for the electrical conduit Trench should be located at least 18 deep and follow all applicable NEC codes Connect electrical wiring to Junction box accord...

Страница 7: ... is located and replace disc and retainer screws Torque to 63 67 in lbs Replace cutter with the correct shims Install washerandtorquehexheadboltto71 75in lbs applyLoctite262thread lock sealant or equal to bolt threads prior to insertion Check running clearance withpumpinverticalpositiontoremoveendplay Clearancemustbebetween 0 007 and0 012 toobtainefficientgrindingwhenpumpisputbackinservice 8 Check...

Страница 8: ...long service life from the product Provided is a suggested maintenance schedule Every year Inspect basin report any sighting of grease accumulation Check for proper and unobstructed float operation Listen for proper check valve operation Every 8 years or 2 000 hours of operation Remove pump inspect and service using a Zoeller rebuild kit Flush and clean basin If the above checklist does not reveal...

Отзывы: