5
© Copyright 2019 Zoeller
®
Co. All rights reserved.
5.1) Testing of Pump (Main Switch)
1)
With the discharge line in place, plug in the pump.
2)
Pour water into the pump reservoir, through one of the inlets, until the pump activates to verify that the unit works.
5.2) Testing of Safety Switch (If applicable)
Note:
Unplug the pump for this test.
1)
Energize the appliance so that it runs.
2)
Pour water into the reservoir as described in Section 5.1 item 2.
3)
As water rises in the reservoir, the overflow Switch should activate, breaking the thermostat circuit to the appliance.
4)
Plug the pump in and allow the pump to empty the tank. As the water level decreases, the appliance will reset.
STEP 5
Testing of Pump Operation
Maintenance Guidelines
Cleaning of Reservoir:
1) Remove entire pump from wall, if mounted.
2) Disassemble reservoir from the deck by inserting a screwdriver in either side of the deck.
3) Clean reservoir as needed.
.
4) Reassemble reservoir to the deck.
Cleaning of Check Valve:
1) Remove discharge line from valve.
2) Remove check valve with 9/16” wrench.
3) Visually check for obstructions or damage.
4) Replace valve by hand tightening, then tighten 1/2 turn with a 9/16” wrench.
CAUTION
Do not overtighten.