3
© Copyright 2015 Zoeller
®
Co. All rights reserved.
"ON"
LEVEL
"OFF"
LEVEL
B
A
2.1) Install the float attachment
clamp as shown in Detail A.
IMPORTANT! DO NOT
INSTALL SWITCH CORD
UNDER HOSE CLAMP
2.2) Set the pumping range
according to Chart A and
Figure 2.2.
2.3) Secure the hose clamp to
the discharge pipe.
1.1) Refer to Figure 1.1 for a typical pump installation.
STEP 1
INSTALLATION OF THE PUMP IN THE PIT
(typical installation)
Figure 1.1
IMPORTANT! TETHER
LENGTH CANNOT BE
LESS THAN 4" (10 CM).
DETAIL A
SK2175
CHART A
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
17
0
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
TETHER LENGTH (INCHES)
(DIMENSION "A")
MIN. TETHER LENGTH
(DIMENSION "B")
PUMPING RANGE (INCHES)
20
21
22
23
24
25
26
27
16
4” (10.2 cm)
6” (15.2 cm)
8” (20.3 cm)
10” (25.4 cm)
12” (30.5 cm)
14” (35.6 cm)
16” (40.6 cm) 26” (66.0 cm)
22” (55.9 cm)
18” (45.7 cm)
14” (35.6 cm)
10.5” (26.7 cm)
8” (20.3 cm)
6.5” (16.5 cm)
Tether "B"
Range "A"
STEP 2
INSTALLATION OF THE VARIABLE LEVEL FLOAT SWITCH
CHECK VALVE
WEEP HOLE
DISCHARGE
PIPE
SECURE CORD
TO PIPE
PUMP
COVER
VENT PIPE
PROPERLY GROUNDED CIRCUIT
(GFCI)
SK2065
DETAIL "A"
4" (10 cm)
MIN.
SK2067A
IMPORTANT! **SECURE THE PUMP POWER
CORD TO THE DISCHARGE PIPE AS SHOWN IN
FIGURE 2.2. CORD SHOULD BE AT OR ABOVE
THE PUMP “ON” LEVEL.
Figure 2.2
SK2067B