INSTALLATION INSTRUCTIONS
10. Install a 2 in. check valve (not included) above the
union to prevent back-flow.
11. Install a 2 in. gate valve (not included) above the check
valve as required by local, regional or state codes.
12. Connect remaining discharge pipe into main waste
line to sewer or septic tank.
Check
Valve
Gate
Valve
Main
waste line
10
11
12
INSTALLATION INSTRUCTIONS
13. Attach power supply cord to discharge pipe using
cable or zip ties (not included) to allow the float switch
to move freely.
14. Connect pump power supply cord to a receptacle
protected by a ground fault circuit interruptor (GFCI).
Cable or
Zip Ties
GFCI
protected
receptacle
13
14
15. Fill the basin with water to check operation. The pump
will start when the water level has reached the switch
“on” level. Refer to page 4 for “on” level.
On
15