11
12. Thread 2 in. coupling (not included) into the vent
opening on the top of the basin (B).
12
B
14
14. Attach rigid 2 in. vent pipe (not included) to the vent
pipe coupling according to local, regional, and state
codes.
13. Thread 1-1/2 in. coupling (not included) into the
discharge opening at the top of the basin (B).
13
B