H0493700.A - EN - 2014-07
7
• Remove the protective cover from the peristaltic pump,
•
Cut a suitable length of pipe from the coil supplied to connect the
peristaltic pump to the injection non-return valve located on the
POD Kit
• Attach the pipe to the threaded connector on the peristaltic
pump outlet.
• Attach the other end of the pipe to the injection non-return valve.
b) Installing the intake pipe (container > peristaltic pump)
•
Cut a suitable length of pipe from the coil supplied to connect the
container of pH minus to the peristaltic pump.
• Attach the pipe to the threaded connector on the peristaltic
pump inlet.
• Make a hole to fit the diameter of the intake pipe in the cap of
the pH minus container and another smaller hole to avoid the
container distorting as the product is sucked up.
•
Pass the free end of the pipe through the hole made in the cap
and put the ceramic counterweight and threaded locking nozzle
on the end.
• Ensure that ALL connections are correct and watertight before
operating the pH Link or Dual Link module.
• Replace the protective cover on the peristaltic pump.
2.3.2 Installing the flow switch
2 positions possible:
• After the upstream valve if the cell is
in by-pass (
1
)
•
On the POD kit, if the cell is inline
(
2
)
a) pH Link or Dual Link module
installed at the same time as the power pack.
• Locate the flow switch supplied with the power pack.
• Screw the flow switch into the seat provided on the POD Kit (hand-tighten).
The arrow that indicates the water flow rae on the top of the flow switch must be perfectly parallel with the
pipes on which the POD kit is positioned.
b) pH Link or Dual Link module added to an installation already equipped with a power packl
When the swimming pool already has a power pack, the flow switch is already installed. Leave the flow switch in place.
Unscrew the threaded adaptor located on the POD Kit and replace it with the stopped supplied to seal the hole.
2.3.3 Installing the pH minus injection line
When handling chemical products, always use appropriate safety equipment (safety glasses, gloves and jacket).
a) Installing the injection line (peristaltic pump > non-return valve)
1
2
pH Link
Dual Link