- 2 -
INTRODUCTION
General delivery terms
All equipment, even POST and PACKAGING PAID, is shipped at the sole risk of the receiver. The latter must record all reserves
in writing on the shipping note of the HAULER in the case of visible or possible transport damage (Confirmation must be sent to
the HAULER by registered mail within 48 hours).
Remark:
if this is not the case, place the unit upright on the pallet and check its general state (if there is a doubt concerning
correct machine operation, note the appropriate reserves on the hauler’s shipping note).
Packaging and content
An accessories sachet is placed inside the unit (to recover this sachet, refer to the chapter «CONNECTIONS» paragraph «Access
to technical compartment»).
Product name plate
Before using or working on the unit, always check that the voltage indicated on the name plate corresponds to the power supply
available (refer to the chapter «DESCRIPTION» for location of the name plate).
Water treatment
For our appliances to function under the best possible conditions, the following parameters must be respected: free chlorine: max.
2.5 mg/l, total bromine : max. 5.5 mg/l, pH between 6.9 and 8.0. When using a chemical or electrical disinfecting system, the
installer and user must check with the manufacturer that this system is compatible with our equipment. These systems must
always be installed after the heating system.
1030
520
830
Transport upright in
the original packaging.
Weight of heat pump
PowerPAC 1M
with packaging :
≅
55
kg
Weight of heat pump
PowerPAC 2M
with packaging :
≅
56
kg
Weight of heat pump
PowerPAC 3M
with packaging :
≅
75
kg
Contents of sachet :
2 sealing rings + 2 half-union connectors Ø50 to be glued
+ 5 anti-vibration pads + 1 cable gland Ø21
.
The unit must always be stored and transported upright on a pallet and in the original packaging.
If the unit is stored or transported laying down, wait at least 12 hours before switching on.
+
Technical
instructions
Warranty
card