background image

A5 

 

DESCRIPTION – BESCHREIBUNG – DESCRIZIONE – DESCRIPCION 

 

 

Français 

English 

Deutch 

Italiano 

Español 

 

Quille gonflable 

Inflatable keel 

Aufblasbarer Kiel 

Chiglia gonfiabile 

Quilla hinchable 

Valve de gonflage 

quille 

Keel inflation valve 

Ventil für das 

Aufblasen des Kiels 

Valvola di 

gonfiaggio chiglia 

Válvula hinchado 

quilla 

Robinet d’inter- 

communication 

I/C valve 

Verbindungsventil 

Rubinetto 

intercomunicante 

Grifo 

intercomunicación 

Plancher aluminium 

Aluminum 
floorboard 

Aluminiumboden  Pagliolato alluminio 

Suelo aluminio 

Plaque support 

moteur 

Engine mount plate 

Motortragplatte 

Piastra supporto 

motore interna 

Placa soporte 

motor 

Saisines 

Grab lines 

Bootskrabber 

Cima tientibene 

Guirnaldas 

Anneau D de 

levage 

Lifting D ring 

Ring D 

Anello a D 

Anilla D 

Planche butée 

Stumble over board 

ErlaSSbrett 

Tavola di bloquage 

Tabla delantera 

Volets avant 

Bow floorboards 

Vordere Flügel 

Alette anteriori 

Piezas delanteras 

10 

Embout de cône 

arrière 

Molded cone ends 

Endstück 

Heckkonus 

Coni di poppa 

rinforzati 

Cono moldeado 

posterior 

11 

Défense antiragage 

Fender 

Schamfilschutz 

Bottaccio di 

protezione 

Perfil defensa 

12 

Profil d’étravage 

Stem reinforcement  Vordersteren profil 

Rafforzamento di 

gambo 

Refuerzo de perfil 

13 

Anneau de 

remorquage 

Towing ring 

Abschleppring 

Anelli di rimorchio  Anilla de remolcado 

14 

Poignée avant 

Bow handle 

Griff vorne 

Maniglia anteriore 

Asa delantera 

15 

Tableau arrière 

Transom 

Heckspiegel 

Specchio di poppa 

Espejo de popa 

16 

Plaque métallique 

remorquage 

Metal plate towing 

Metallplatte 

Schleppschiffart 

Targua metallica 

rimorchio 

Placa metálica 

remolque 

17 

Plaque moteur 

sacrificielle 

Wood transom pad 

Auswechselbare 

Motorplatte 

Placca supporto 

motore esterna 

Placa refuerzo 

motor 

18 

Petits flotteurs 

Lower tubes 

Unterseite 

Schlauchkörper 

Tubolari inferiore 

Flotador inferior 

19 

Profilé d’échouage 

Stranding 

reinforcement 

Aflaufenprofil 

Profilato 

d’arenamento 

Perfil refuerzo 

flotador 

20 

Vide-vite 

Self bailer 

Schnellablass 

Autovuotante 

Desagüe 

21 

Valve de gonflage 

petits flotteurs 

Lower Tube 

inflation valve 

Ventil für des 

unterseite 

Schalauchkörper 

Valvola di 

gonfiaggio Tubolari 

inferiore 

Válvula hinchado 

flotadores inferiores 

 
 
 
 

 
 

 
 
 
 
 

Содержание MILPRO HEAVY DUTY Series

Страница 1: ...BOOTES LESEN SIE DIESES HANDBUCH SORGF LTIG DURCH LEGGERE ATTENTAMENTE IL PRESENTE MANUALE PRIMA DI UTILIZZARE IL BATTELLO ANTES DE UTILIZAR LA EMBARCACI N LEA ESTE MANUAL CON ATENCI N Manuel du Prop...

Страница 2: ...ed onboard during navigation Volume 2 gives technical specifications and assembly instructions for the boat and its equipment SERIE HEAVY DUTY MARK 4 MARK 5 MARK 6 SUMMARY Page Page Procedure for putt...

Страница 3: ...s 5 BOAT ASSEMBLY 5 Inflate the buoyancy tube 6 BOAT INFLATION 6 Inflate the keel and the lower tubes 6 BOAT INFLATION 7 Adjust the pressures 7 8 AIR PRESSURE 8 Store the boat 9 10 DEFLATION FOLDING I...

Страница 4: ...on position Unscrew the cap Screw the valve into its base thigten fully without damaging the thread keep the cap at hand To close the valve after inflation Screw on the cap To deflate the buoyancy tub...

Страница 5: ...4 10 To deflate the buoyancy tube Put the I C valve in the inflation zone red Take the valve insert with its cap off the base Inflation position Navigation position...

Страница 6: ...in a pointed roof position Make sure the elements are lined up straight Flatten the point by getting into the boat and pulling UP on the grab lines this prevents the fabric from getting pinched Fig 2...

Страница 7: ...ANCY TUBE Set in the floorboard and the stringers before to inflate the buoyancy tube Inflate the buoyancy tube until green area of the pressure indicator Screw the cap after inflation Close the valve...

Страница 8: ...ssure 240 mb 3 4 PSI When you launch the boat into 20 C 68 F water the temperature and the internal pressure in the compartments will both decrease as much as 120mb Consequently the boat must be toppe...

Страница 9: ...n position green screw on the cap IN CASE OF OVERPRESSURE Standard valve A take off the cap let some air escape by lightly pushing down on the diaphragm 1 with a blunt instrument like a pen ATTENTION...

Страница 10: ...shing powder Remove all water and dry the boat completely before storage Fold both sides of the buoyancy tube towards the interior Fig 1 bring up the cones against the transom Fig 2 and then fold the...

Страница 11: ...OAT STORAGE AFTER USE To store the boat inflated open the self bailers Rince the boat with fresh water in order to remove any sand seaweed etc Remove all water make sure that no water is left in the b...

Страница 12: ...A5 Illustrations Assembly of the boat A8 Inflation system A9 ANHANG Technische daten A2 A3 Beschreibung A4 A5 Illustrations Montage des bootes A10 Aufblassystem A11 ALLEGATO Caratteristiche techniche...

Страница 13: ...50 250 320 lb 331 551 705 5 2 1 5 2 1 7 2 1 CERTIFICATION AUSLEGUNGSKATEGORIE CATEGORIA DE DISE O CERTIFICACI N 94 25 CE C MOTORISATION OUTBOARD DATA AU ENBORDMOTOR MOTORIZZAZIONE MOTORIZACI N L s L M...

Страница 14: ...are see Technical Specifications Die zul ssige Nutzlast wurde gem ISO Normen berechnet Fahren mit oder nahe der zul ssigen Nutzlast ist nur empfehlenswert in ruhigem Wasser und mit reduzierter Geschwi...

Страница 15: ...A4 DESCRIPTION BESCHREIBUNG DESCRIZIONE DESCRIPCION...

Страница 16: ...nus Coni di poppa rinforzati Cono moldeado posterior 11 D fense antiragage Fender Schamfilschutz Bottaccio di protezione Perfil defensa 12 Profil d travage Stem reinforcement Vordersteren profil Raffo...

Страница 17: ...k 6 HD Fig 1 a floorboards b hull main buoyancy tubes c corner reinforcement d bottom hull Fig 2 Make a tent step on it to push boards down Mark 4 Mark 5 HD Mark 6 HD Sun decal sticker 8 found on stri...

Страница 18: ...A9 INFLATION SYSTEM...

Страница 19: ...32 bis boulevard Haussmann 75009 PARIS Z65071 Octobre 2013 ZODIAC MILPRO INTERNATIONAL...

Отзывы: