2
3
ZODIAC BELIEVES IN SAFETY FIRST
INSTALLATION GUIDE
POSITIONING THE POWER PACK
1. Locate a suitable space for the power pack bracket. It should be
installed no further than 1.8 metres away from the cell - ideally in a
½PXVEXMSRWLIHSVGPSWIXSXLI½PXVEXMSRIUYMTQIRX
40)%7)238)MJ½\MRKXSETSWXMXQYWXLEZIE[EXIVTVSSJTERIP½XXIHFILMRHXLIYRMX
EXPIEWXQQ[MHIERHQQLMKL
2. Using screws provided, fasten the bracket securely to the wall and
position the power pack on the bracket. Plug into power point, but
don’t turn on the power.
POSITIONING THE CHLORINE GENERATING CELL
40)%7)238)8LIGIPPWLSYPHEP[E]WFIXLIPEWXHIZMGITPEGIHSRXLI[EXIVTMTI
-RXLIVIXYVRPMRIXSXLITSSP
3. Ensure the cell is placed horizontally, with the Inlet pipe connecting to
XLI½XXMRKGPSWIWXXSXLIGIPPPIEH
9WMRKWGVI[FEVVIP½XXMRKWWYTTPMIHEXXEGLXLIGIPPXSXLITMTI-JYWMRK
QQTMTI]SY[MPPRIIHXS½XXLIGIPPYWMRKXLIVIHYGMRKFYWLIWEPWS
supplied).
5. When connecting the lead from the power pack to the cell match up
XLIGSVVIWTSRHMRKGSPSYVWERHTMRWXLIR½XXLIIRHGET
2SXI)MXLIV6)([MVIGERFIGSRRIGXIHXSIMXLIV6)(TMRSRXLIIPIGXVSHI