![Zodiac Pool Systems Ei Series Скачать руководство пользователя страница 11](http://html2.mh-extra.com/html/zodiac-pool-systems/ei-series/ei-series_installation-and-operation-manual_3951493011.webp)
P a g e
|
11
TOOLS NEEDED FOR INSTALLATION
•
Cordless Drill (or Power Drill)
•
6 mm (15/64 in.) Hammer Drill Bit (only necessary to
drill into brick or concrete)
•
Pencil or Marking Pen
•
Phillips Head Screwdriver or Phillips Head Drill Bit
Section 3. Installation Instructions
WARNING
FOR YOUR SAFETY:
This product must be installed and serviced by a professional pool/spa service technician as
described on the front cover of this manual. The procedures in this manual must be followed exactly. Failure to follow
warning notices and instructions may result in property damage, serious injury, or death. Improper installation and/or
operation will void the warranty.
WARNING
EQUIPMENT UNDER PRESSURE:
Always turn pump off prior to installing or servicing the Zodiac AquaPure
Ei Series APURE35C chlorine generating device. Your pump/filter system is operated under pressure and the pressure
must be released before you begin work. Please see your pump/filter owner’s manual for further instructions.
Disconnect power to the system at the main circuit breaker before performing this procedure to avoid risk of electric
shock which can result in property damage, severe injury or death.
Before you begin your installation, please check that you have the right tools and a suitable location to install the power
pack and cell. Please ensure that you have read and understood the Important Safety Instructions section.
3.1
Materials and Tools
3.2
Installation Requirements
WARNING
The Zodiac AquaPure Ei Series APURE35C chlorine generating device must be installed horizontally with the cell above
the pipe to avoid buildup of flammable gases which can result in FIRE OR EXPLOSION.
The installation requirements for the Zodiac AquaPure Ei Series APURE35C chlorine generating device are as follows:
•
The power pack must be installed at least 1.5 m (5 ft.) vertically off the ground.
•
The power pack must be installed at least 3 m (10 ft.) from the inside wall of your swimming pool or built-in spa.
•
The cell must be installed on a 0.4 m (1 ⅓ ft.) horizontal length of pipe after the heate
rs, pumps, and filters, as the last
piece of equipment in the circulation plumbing system just before the pool
(see Figure 3).
•
The cell must be installed no more than 4.6 m (15 ft.) from the power pack (see Figure 3).
•
It is recommended that the cell be installed 0.25 m (10 in.) from any 90° elbow.
INSTALLATION MATERIALS FURNISHED
•
Pipe Spacer - for 40 mm (1½ in.) pipe
•
Hole Saw
•
Screw Set (includes wall plugs)
•
Installation and Operation Manual
Содержание Ei Series
Страница 35: ......