14
Designer W
all Hood Installation
DESIGNER WALL HOOD INSTALLATION
8. Find the center of the wall where you are installing the hood. Make sure there
is sufficient bracing to hold the weight of the hood. Mark your center line and
measure out from the center to find your two mounting points. Make sure your
mounting points are level when you mark them. It is recommended to install the
hood directly into wood supports.
Figure 7
9. Mark the mounting points and install the two mounting screws provided leaving
the heads out ¼˝ to mount the hood.
Figure 8
10. Mount the main body of the hood to the two screws and screw into place.
Figure 9
Figure 7
Figure 8
Figure 9
Screw
+0”/-2”
Содержание 697-R-30
Страница 11: ...4 Wall Hood Installation WALL HOOD INSTALLATION Installation Tutorial Video 30 36 36 Height 16 max 31...
Страница 34: ...27 Under Cabinet Installation UNDER CABINET INSTALLATION Installation Tutorial Video 30 36 Height 30 Scan Me...
Страница 38: ...31 Insert Installation INSERT INSTALLATION Installation Tutorial Video 36 30 36...
Страница 52: ...45 Single Motor Electrical Diagram SINGLE MOTOR ELECTRICAL DIAGRAM CHANGING PARTS...
Страница 53: ...46 Double Motor Electrical Diagram CHANGING PARTS DUAL MOTOR ELECTRICAL DIAGRAM...
Страница 103: ...Installation Guide and User Manual 1 614 777 5004 1 1 0 www zlinekitchen com...