![Zline 697-R-30 Скачать руководство пользователя страница 27](http://html1.mh-extra.com/html/zline/697-r-30/697-r-30_installation-manual-and-users-manual_4096292027.webp)
20
Island Hood Installation
ISLAND HOOD INSTALLATION
1. Slide chimney pieces over the angle iron on the hood. Pull the electrical plug to
the top of the chimney sections.
Figure 4
2. Lift the hood to attach the angle iron to the ceiling bracket. Use screws provided
to attach.
3. Make your electrical and ducting connections. Use rigid ducting wherever
possible. Try and minimize the use of elbows. More elbows and longer
runs create higher static pressure. No more than two to three elbows are
recommended. The hood comes with a grounded three prong plug that can be
plugged into a 20 amp circuit in the ceiling. The is 36” long.
4. Slide top chimney piece up over the mounting bracket on the ceiling and secure
it in place with the provided screws.
Figure 5
5. Install stainless steel baffle filters. Before installing baffle filters, make sure that
you insert the grease cup under the motor blower.
Figure 4
Figure 5
1. Screw
2. Screw
Screw
Содержание 697-R-30
Страница 11: ...4 Wall Hood Installation WALL HOOD INSTALLATION Installation Tutorial Video 30 36 36 Height 16 max 31...
Страница 34: ...27 Under Cabinet Installation UNDER CABINET INSTALLATION Installation Tutorial Video 30 36 Height 30 Scan Me...
Страница 38: ...31 Insert Installation INSERT INSTALLATION Installation Tutorial Video 36 30 36...
Страница 52: ...45 Single Motor Electrical Diagram SINGLE MOTOR ELECTRICAL DIAGRAM CHANGING PARTS...
Страница 53: ...46 Double Motor Electrical Diagram CHANGING PARTS DUAL MOTOR ELECTRICAL DIAGRAM...
Страница 103: ...Installation Guide and User Manual 1 614 777 5004 1 1 0 www zlinekitchen com...