2. Installation Procedure
2
Preparation before Installation
Prepare the necessary tools.
1.
Network Cable
Marker Pen
Small Cross
Screwdriver
6mm Expansion
Rubber Plugs
and Screws
Knife
Large Cross
Screwdriver
Tape Measure
6mm Impact
Drill
Power Strip
Level Ruler
Unpacking and Device Testing: Take out the power adapter, power cable and device from
the packing from the box one at a time. Connect the power cable to the device and turn it
on; check the device appearance for scratches and other defects.
2.
Содержание FaceKiosk-H10A
Страница 10: ...9 ...
Страница 17: ...Copyright 2023 ZKTECO CO LTD All Rights Reserved ...