background image

5EVM-D · Electric Vehicle Home AC Charging Station 

 

 

23 

M5EVMD2011I 

5EVM-D: Electric Vehicle Home AC Charging Station 

© ZIV APLICACIONES Y TECNOLOGÍA, S.L.U. 2020 

 

 

 

Preferred charge mode 

Immediate 

Deferred 

Allows you to change the preferred charging mode for 

those models with “free charge” function active. 

LEDs Color 

White. 

Button Action 

ESC 

 

Goes to 

Configuration

 screen. 

OK 

 

Confirms your selection. There are two options: 

-  Immediate:  shows 

Applied change

  during the 

defined time and returns to 

Start

-  Deferred: goes to 

Establish programmed charge

.  

↓↑

 

 

Cursor selection. 

RFID Action 

None. 

EV Action 

None. 

Contracted power  

Contracted power 

5.5 kWh 

In this screen you can set the contracted power for those 

models with Load Balancing function. 

LEDs Color 

White. 

Button Action 

ESC 

 The previous editable position is selected. If the 

cursor is on the first position, it exits to 

Configuration

OK 

 The next editable position is selected. If the cursor is 

on the last position, the change is applied (

Applied change

 

is displayed for the defined time) and returns to 

Start

↓↑

 

  Increase/decrease the value. 

RFID Action 

None. 

EV Action 

None. 

Language 

Spanish 

Basque 

English 

Select from the list of available languages. 

LEDs Color 

White. 

Button Action 

ESC 

 

Goes to 

Configuration

 screen. 

OK 

 Confirms your selection. 

There are three options: 

Spanish 

Basque 

English

.  

The position is selected, the change is applied (

Applied 

change

 is displayed for the defined time) and returns to 

Start

↓↑

 

 

Cursor selection. 

RFID Action 

None. 

EV Action 

None. 

 

Содержание 5EVM

Страница 1: ...Instructions Manual for 5EVM Recharging Points M5EVM2011Iv00 Rev 00 May 2021 ZIV APLICACIONES Y TECNOLOG A S L U 2020 5EVM Electric Vehicle Home AC Charging Station...

Страница 2: ...8 4 3 1 Equipment Power Supply 9 4 3 2 Vehicle Power Supply 9 4 3 3 Pilot Wire CP 9 4 3 4 Communication of the Recharging Points Network 9 4 3 5 USB Port 9 4 3 6 Domestic Charge Measurement 10 4 4 Saf...

Страница 3: ...and efficiency thanks to the use with smartphone via a Bluetooth App and the possibility to optimize the vehicle charging according to the consumption of the installation If you have purchased a Basic...

Страница 4: ...e location it may be necessary to install an external overvoltage protection to the device AC Power Supply 230 V 50 Hz 10 Single Phase or Three Phase Overvoltage Category Cat III Output Maximum Power...

Страница 5: ...CD having a rated residual operating current not exceeding 30 mA b RCD s protecting connecting points shall be at least type A and fulfill the standards specified in section 8 5 in IEC 61851 1 Fulfill...

Страница 6: ...vehicle conductive charging system Part 1 General Requirements IEC 61851 21 2 2018 Electric vehicle conductive charging system Part 21 2 Electric vehicle requirements for conductive connection to an...

Страница 7: ...that is attached to the wall Front Hides the active parts of the equipment and is attached to the base Wire cover Provides access to the electrical connection communications and configuration parts In...

Страница 8: ...oose parts 4 2 Mounting Installation is wall mounted The surface of the wall where the equipment is placed must be resistant both for fixing the device and for supporting its weight When installing th...

Страница 9: ...roximately 4 mm from the wall 2 Place the recharging station on the screw To do this the screw head is positioned inside the upper hole Figure 3 Form of Fixation 3 Position the equipment so that it is...

Страница 10: ...ns The installation of the equipment requires an external overcurrent protection MCB and a differential breaker RCD 4 3 Connection Elements To access the connection remove the front wire cover The con...

Страница 11: ...hree phase 4 3 2 Vehicle Power Supply The power supply cables and the IEC62196 2 hose ground which is connected to the vehicle are screwed into the terminals shown in Figure 5 as connector 2 The equip...

Страница 12: ...his work environment and the safety standards 2 Specifically only qualified personnel should carry out the installation and handling of the equipment and the operating environment should be appropriat...

Страница 13: ...GENERAL INFO 3 Select CHARGE NOW The LEDs will now flash yellow and the display will show PLUG CONECTOR 4 Connect the hose Charging begins immediately LEDs turn to fixed blue and display shows Energy...

Страница 14: ...the AC differential protection is not inhibited at any time 5 5 Reconnector When it comes to installing a charging point in the home environment the majority opts for scheme 2 according to the Spanis...

Страница 15: ...tion other than acting on the house switch 5 6 Domestic Load Balancing optional on PREMIUM Model This functionality is optional for the user Remember to ask ZIV for the 5EVM model that includes it and...

Страница 16: ...dual plug charger they light up independently for each plug These LEDs are RGB and their operation depends on the screen displayed and the status of the EV Default Screen There is an inactivity time o...

Страница 17: ...rwise to Nor Authorized User EV Action free_charging_mode on and change to B or C state Starts the preferred recharge The screen will depend on the type of recharge o Programmed charge Waiting for cha...

Страница 18: ...Authentication is performed Failed authentication Nor Authorized User Successful authentication without charging session Main menu without recharging open charging session Main menu during recharging...

Страница 19: ...the line where the cursor is it goes to a different screen CHARGE NOW Plug Connector PROGRAM CHARGE Establish programmed charge CONFIGURATION Configuration GENERAL INFO General info RFID Action None...

Страница 20: ...st position the set values are saved and goes to Waiting for charging start if the EV is connected or goes to Plug connector if it is not connected If no time is selected Invalid range RFID Action Non...

Страница 21: ...tton Action ESC Goes to Main menu during recharging screen RFID Action Stopping Session EV Action Changes to A state Stopping Session Changes to B or C state None Waiting for charging start WAITING ST...

Страница 22: ...figuration Date time Users Charge mode Contracted power Language On this screen the configuration options will be displayed by means of the cyclic menu All the options are displayed using the scroll b...

Страница 23: ...its to Configuration OK The next editable position is selected If the cursor is on the last position the change is applied Applied change is displayed for the defined time and returns to Start Increas...

Страница 24: ...n of this thread Cancel returns to Users cards management without taking any action Cursor selection RFID Action Initial card pass to add it as valid EV Action None Delete card Swipe card through read...

Страница 25: ...you can set the contracted power for those models with Load Balancing function LEDs Color White Button Action ESC The previous editable position is selected If the cursor is on the first position it e...

Страница 26: ...arges historical log RFID Action None EV Action Open charging session o Changes to A state Stopping Session o Changes to other states None Without charging session None Firmware version Firmware versi...

Страница 27: ...e EV Action Open charging session o Changes to A state Stopping Session o Changes to other states None Without charging session None Recharge detail User 05ABC10E Duration 3h23m Total 327 73 kWh This...

Страница 28: ...ne Applied change Change applied This screen is displayed each time a configuration change is made This screen will last approximately 2 3 seconds Afterwards you will move to the upper preview screen...

Страница 29: ...led LEDs Color White Button Action ESC Goes to Start screen RFID Action None EV Action None Bluetooth Card associated CARD ASSOCIATED This message is displayed when the linkage has been successful LED...

Страница 30: ...Annex Dimensions and Marking...

Страница 31: ......

Страница 32: ......

Отзывы: