WWW.
ZIPPITY
-OUTDOOR.COM
6
ASSEMBLY
INSTRUCTIONS
ZP19047
Ensuring the routed
holes are facing
down, slide the other
horizontal rail over
the top of the posts.
Continue sliding the rail
down, inserting each
vertical picket into the
routed holes in the top
rail, until the pre-drilled
holes in the top rail and
posts align. Drive (4)
¾” self-drilling stainless
steel screws into the
pre-drilled holes.
STEP 4.4
STEP 4.3
STEP 4.2
Ensuring the routed holes are
facing up, slide one rail over the
bottom of the posts. Slide the rail up
and guide the vertical pickets into
the routed holes. Continue sliding
the rail up until the pre-drilled holes
in the rail and posts align.
Take the post anchors
(B)
, and slide
them into the bottom of the posts. 16”
of the post anchor should be visible
below the posts. Drive (4) ¾”self-drilling
stainless steel screws
(H)
into the pre-
drilled holes in the horizontal rail.
Note:
align holes.
16 in
B
H