WWW.
ZIPPITY
-OUTDOOR.COM
8
ASSEMBLY
INSTRUCTIONS
ZP19047
Level the screen as
necessary, backfill
excavated dirt, and
tamp down.
Optional:
If your ground is very hard, you
may need to dig a single hole large
enough to accommodate one post
from each panel. This hole should be
approximately 8” in diameter and 16”
deep. Backfill and tamp the dirt.
STEP 5.3
STEP 5.4
8” diameter
x
16” deep.
Level