background image

WWW.

ZIPPITY

-OUTDOOR.COM

10

ASSEMBLY 

INSTRUCTIONS

ZP19009

1. 

Slide (1) horizontal 

rail down over the 

privacy boards starting 

at one end of the 

boards as shown. 

Ensure that the rail is 

inserted fully over the 

boards and rests inside 

the rail brackets. 

2. 

Drive (4) 3/4" self-

drilling stainless steel 

screws through the 

pre-drilled holes in the 

front and back of the 

rail brackets. 

STEP 5.4

STEP 5.3

Preview

Preview

1. 

Orient post C and post 

D as shown below.

2. 

Repeat steps 5.1 - 5.3 

for these posts to create 

the second shower wall. 

1

2

Top View

D

C

2

1

Содержание HAMPTON ZP19009

Страница 1: ...NS ZP19009 WWW ZIPPITY OUTDOOR COM VER 051121 ASSEMBLY INSTRUCTIONS ZP19009 HAMPTON OUTDOOR VINYL SHOWER KIT 62 W X 47 L X 89 H 6 HOURS Approximate assembly and installation time Want to see a video on how to assemble this product Scan the QR code ...

Страница 2: ... department parts nychbrands com support zippity outdoor com 704 892 5222 877 234 6196 Customer service agents are available to take calls weekdays from 9am 5pm EST If you call outside of business hours please leave a voicemail To help you quickly and accurately please have reference item number ZP19009 and the specific part name which can be found on page 4 and 5 It is helpful if you can provide ...

Страница 3: ...WWW ZIPPITY OUTDOOR COM 3 ASSEMBLY INSTRUCTIONS ZP19009 46 1 2 in 39 in 35 in 70 in 10 in 42 in 35 in 10 in 88 3 4 in 79 3 4 in 62 1 4 in 1 2 in 1 2 in 1 in 37 in ...

Страница 4: ... Stainless Steel Screw 89 Vinyl Weld Glue Shade Slat 9 Post Trim Cap 4 Decorative End Cap 4 Post C 1 2 x 3 x 873 8 Post D 1 2 x 3 x 873 8 Beam 2 1 x 4 x 48 Post B 1 2 x 3 x 873 8 Rail Bracket 12 Privacy Board 11 x 12 x 563 8 STEP 1 LAY OUT MATERIALS Post Cap 4 O P Q N M A B Horizontal Rail 6 1 x 3 x 347 8 U Channel 6 7 8 x 1 x 53 I J K L C D Post A 1 2 x 3 x 873 8 F E G H ...

Страница 5: ...cal Door Rail 2 1 x 3 x 53 Door Brace 1 Latch Kit w 3 4 Steel Screws 1 Hinge 2 T Corner Brackets 4 Privacy Board Narrow 1 1 2 x 63 4 x 563 8 Y Privacy Strip 2 7 8 x 3 x 57 W Door Horizontal Rail 2 1 x 3 x 335 8 X V NOT INCLUDED WITH PURCHASE Sold Separately Sold Separately For in ground installation For wood or concrete surface mounting Only needed if installed on concrete Only needed if installed...

Страница 6: ...t 4 surface mounts ZP19011 into the bottom of all 4 posts The surface mount will be secured in the next step In Ground Installation Insert 4 post extensions ZP19012 into the bottom of all 4 posts The post extensions will be secured in the next step Preview Preview ZP19011 ZP19012 Note Surface mounts sold separately Note Post extensions sold separately ...

Страница 7: ...nless Steel Screws P into the aligned holes securing the brackets to post A STEP 3 INSTALL BRACKETS STEP 3 1 STEP 3 2 Preview Repeat step 3 1 for Post B B Post C C and Post D D Two additional brackets will need to be installed on the side face of both post B and post D Align the brackets with the pre drilled holes in the sides of these posts and secure the brackets with 16 3 4 self drilling stainl...

Страница 8: ...groove of the U channel is centered with the brackets 2 Drive 3 11 4 White Self Drilling Stainless Steel Screws N through the pre drilled holes in the U channel STEP 4 1 Install the U channels between the brackets on the remaining 3 posts in the same manner as step 4 1 Post B and post D will each have 2 U channels on each post A B C D L A Preview N N N 1 2 ...

Страница 9: ...l screws into the pre drilled holes in the rail brackets STEP 5 2 STEP 5 ASSEMBLE SIDE PANELS STEP 5 1 1 Top View Preview Preview B A 2 3 1 Insert 1 Privacy Board I into the bottom rail Angling the board insert it into the U channel as shown 2 Insert 1 privacy board on the other end of the rail as shown 3 Slide 1 privacy board down the middle of the boards vertically as shown 1 2 I 3 K ...

Страница 10: ...he rail is inserted fully over the boards and rests inside the rail brackets 2 Drive 4 3 4 self drilling stainless steel screws through the pre drilled holes in the front and back of the rail brackets STEP 5 4 STEP 5 3 Preview Preview 1 Orient post C and post D as shown below 2 Repeat steps 5 1 5 3 for these posts to create the second shower wall 1 2 Top View D C 2 1 ...

Страница 11: ...d insert it into the U channel as shown 2 Insert 1 privacy board on the other end of the rail as shown 3 Slide 1 privacy board down the middle of the boards vertically as shown 1 Position the side walls as shown below 2 Slide 1 horizontal rail into the rail brackets 3 Drive 4 3 4 self drilling stainless steel screws into the rail brackets Top View C D A B Preview 1 2 3 1 2 3 ...

Страница 12: ...osts 2 Slide the trim caps until they are just below the routed holes in the posts as shown STEP 7 INSTALL BEAMS AND TRIM PIECES STEP 7 1 1 Slide 1 horizontal rail into the upper rail brackets 2 Drive 4 3 4 self drilling stainless steel screws into the upper rail brackets STEP 6 3 1 2 G 1 2 Preview Preview ...

Страница 13: ... is equal length of beam on each side of the shower 3 Secure the beams with 16 11 4 white self drilling stainless steel screws 1 Apply a small amount of Vinyl Glue Q to the inside rim of the Decorative End Caps F 2 Attach the decorative end caps to the ends of the beams 3 Pressure fit 4 Post Caps E over the post Preview Preview J E Q F 1 2 3 N 1 2 3 ...

Страница 14: ...ole locations for all 4 surface mounts 2 Use 1 4 x 3 concrete wedge anchors not included to secure the surface mounts or similar size lag screw if mounting on wood Post Extension Install 1 Mark the post locations and temporarily set the unit aside Dig 4 9 diameter holes 36 deep at the post locations 2 Lower the unit into the ground and fill the holes with concrete not included Use support blocks t...

Страница 15: ...ace 1 Privacy Strip S against the inside of post C as shown The top of the privacy strip should be roughly 11 2 below the horizontal rail 2 Drive 6 11 4 white self drilling stainless steel screws through the pre drilled holes in the privacy strip 3 Repeat this process for post A S A C S 1 2 3 Preview ...

Страница 16: ...l 2 Insert the Privacy Board Narrow R into the opposite vertical door rail 3 Slide the final privacy board between the two boards as shown T U V Insert fully until rail hits back walls 1 2 R Preview Preview 1 2 3 1 Insert 1 Door Horizontal Rail T into 2 Corner Brackets U until it hits the back wall 2 Insert 2 Vertical Door Rails V into the corner brackets until they bottom out against the horizont...

Страница 17: ... Ensure measurements 1 and 2 are equal Top of door Hinge side no screws Leave a screw off here for future latch installation Leavescrews offherefor futurehinge installation W 1 2 3 Preview STEP 10 4 1 Assemble the Door Brace W by sliding the smaller door brace part 1 into the larger door brace part 2 Align the holes and secure with the 3 4 bolts and nuts packaged with the gate brace 2 Ensure that ...

Страница 18: ...g stainless steel screws through the pre drilled holes on the inside of the hinges 1 Secure the 2 Hinges X to the door with 8 11 4 Black Self Drilling Stainless Steel Screws O included with the hinge 2 Fasten the Latch Y to the top of the door with 6 11 4 black self drilling stainless steel screws included with the latch 3 Use temporary spacers to hold the door at the correct height during hinge i...

Страница 19: ...e the screws in the shade slat on the top of the beams and fasten them into the pre drilled holes on top of the beams 3 Repeat this process with the remaining shade slats Preview Preview STEP 12 INSTALL SHADE SLATS STEP 12 1 1 Mark where the latch bolt meets the post on post C 2 Drill a 3 8 hole at the marked location to receive the latch bolt STEP 11 3 H Drive screw here 1 2 3 1 2 ...

Страница 20: ...WWW ZIPPITY OUTDOOR COM 20 ASSEMBLY INSTRUCTIONS ZP19009 WWW ZIPPITY OUTDOOR COM 704 892 5222 877 234 6196 support zippity outdoor com 6935 Reames Rd Ste K Charlotte NC 28216 ...

Отзывы: