
WWW.
ZIPPITY
-OUTDOOR.COM
7
ASSEMBLY
INSTRUCTIONS
ZP19009
1.
Place Post A
(A)
on to a flat surface. Orient (2) Rail
Brackets
(M)
so that the pre-drilled holes in the bracket
align with the pre-drilled holes in the post as shown
below.
2.
Drive (8) 3/4" Self-Drilling Stainless Steel Screws
(P)
into
the aligned holes, securing the brackets to post A.
STEP 3:
INSTALL
BRACKETS
STEP 3.1
STEP 3.2
Preview
Repeat step 3.1 for Post
B
(B)
, Post C
(C)
, and Post
D
(D)
. Two additional
brackets will need to be
installed on the side face
of both post B and post
D. Align the brackets with
the pre-drilled holes in
the sides of these posts
and secure the brackets
with (16) 3/4" self-drilling
stainless steel screws.
A
M
Align
1
2
P
A
B
C
D
Preview
2
1
Align