Page 24 of 28
802265 - Sparkling HT- BCS Compact Commercial - Installation Instructions - 09.16 - v3.01
1.
Press [Start] [Stop] buttons to start and stop the filter
flush.
2.
Turn the flush line stop cock ON (See diagram).
3.
Press [Start] and allow at least 10 litres of water to flush
through the filter.
4.
The product details will be displayed in the screen.
5.
Once the filter flush is finished, Turn the stop cock OFF
then press [Stop] to end filter flush mode.
6.
Press [Next] for the Boiling Calibration screen.
Have a 10L bucket or similar container (not supplied) at the ready to hold a quantity of water that will be
ejected while the Filter Flush Mode is in operation. Open the filter access door on the front of the HydroTap
and the filter cartridge will be exposed. Located to the rear RHS of the cartridge is a flush line, approx 600mm
long and the flush line stop cock. Place the valve end of the flush line into the 10L bucket or container.
6.2
-
Filter Flush
Section 6
Commissioning
6.1
-
CO
2
Purge
1.
Press the [START] button to commence the purging
process.
2.
Purge for 10 seconds and ensure all water has stopped
flowing through the tap. (You will hear the CO
2
gas
escaping from the tap).
3.
Press the [Stop] button.
4.
Press [Next] for the filter flush screen
The HydroTap is now ready to be commissioned.
•
Turn ON the water and gas and check for any leaks.
•
Turn the power ON at the GPO and at the side of the undersink unit
•
If fitted, ensure the Booster is turned OFF. (The Booster is commissioned, later, at section 6.4)
•
Familiarise yourself with the operation of the Tap, in preparation for use (See User Guide)
•
Follow the Installation instructions below (and review Section C of the User Guide).
•
Initially you will be prompted to select a language
•
After commissioning, the system may be customised by selecting further options in
Section G - Settings, within the User Guide.