background image

Page 16 of 28 

   802265 - Sparkling HT- BCS  Compact Commercial - Installation Instructions - 09.16 - v3.01

NOTE1: This appliance is intended for use with the Zip HydroTap  under sink unit. 

NOTE2: Water connections must be pointing vertically upwards.

NOTE3: The booster unit should be installed as close as possible to the Zip  

 

 

    HydroTap Unit as the 400mm connection hoses cannot be lengthened.

    Booster System

3.4

  

 Braided hose connections

1. 

The cold water inlet (blue) and hot water outlet (red) are marked on the rating plate. Connect the 
braided hoses from the ‘Bypass Out’ fitting to the water inlet of the booster unit (Marked Blue) and 
from the outlet of the booster unit (Marked Red) to the ‘Bypass IN’ fitting on the Zip HydroTap  unit. 
Avoid exerting any mechanical pressure on the appliance. This can be achieved by applying a spanner 
on the flats of the inlet and outlet connections when tightening the braided hose connectors. Do not 
overtighten ! Tighten the braided hoses by hand, then turn an additional 90

°

 - 180

° with a spanner

2. 

Once the water connections have been made, check for any leaks and rectify as necessary.

Hot Water

Connection 

(outlet, G1/2”)

Strainer

Cold Water 

Connection 

(inlet, G1/2”)

Hold the hexagon while 
tightening the braided 
hose fittings

Braided Hoses

Typical Installation

Содержание HydroTap BCS Compact series

Страница 1: ...al Installation Instructions 09 16 v3 01 Page 1 of 28 Zip HydroTap Installation Instructions Filtered boiling chilled and Sparkling drinking water for commercial kitchens and tea rooms Affix Model Num...

Страница 2: ...taps is detailed in a separate tap installation instruction book No 803341 supplied with the tap For all operational features of the HydroTap please refer to the User manual No 802266 These three taps...

Страница 3: ...Booster Heater if required Section 3 Booster heater Installation 3 1 Booster Heater specifications and Installation 14 16 STEP 4 Fit the CO2 Gas cylinder Section 4 CO2 Cylinder 4 1 Connect and secure...

Страница 4: ...the total weight of the appliance when full of water Before Commissioning 1 Check the unit has been installed correctly 2 Check all plumbing fittings have been tightened 3 Ensure the outlet and vent...

Страница 5: ...el these units will dispense boiling water factory set to 98 C chilled water factory set to 5 10 C These units are NOT designed to be used for sanitary fixtures The boiling water units are fitted with...

Страница 6: ...safe visible position for connection Venting Sometimes steam and or condensed droplets may discharge through a vent outlet at the tap If the tap is not installed using the Font pedestal ensure the tap...

Страница 7: ...V 50Hz AC operation 7 Undersink units must never be located near or cleaned with water jets 8 Zip HydroTaps are not to be exposed to the elements of nature 9 Due to the process of continuous improveme...

Страница 8: ...se Vent Kit 1 x Inlet vent 1 x Outlet vent 9 x Screws 1 x User manual and 1 x Quick start guide 1 off CO2 gas cylinder regulator assy HydroTap Booster Water System with connection hoses Model BCSHAV 1...

Страница 9: ...Chilled Sparkling BCS100 75 100 75 no 1x10A 2 125 NA 339 x 460 x 335 30 All In One BCSHA A 100 75 100 75 no 1x10A 2 125 NA 339 x 460 x 335 30 BCSHA AV 140 75 140 75 no 1x10A 2 125 2 2 339 x 460 x 335...

Страница 10: ...sitioned so that the connection point and the stop cock will not be obstructed when the undersink units are installed For the mains pressure All IN ONE an external hot and cold water supply will be re...

Страница 11: ...minimum requirement is for a 50mm air gap either side and 300mm above of the undersink unit It is important that the 4mm door buffers For all installations are fitted to the inside edge of the cupboa...

Страница 12: ...ar 35 C or higher the inlet vent See Item B below and silicon buffers need to be fitted If the airflow is still insufficient to maintain normal operating temperatures then the inlet vent and door outl...

Страница 13: ...eatils Air inlet vent 1 Mark out and cut the air inlet and door outlet holes as shown 2 Ensure the air inlet vent and air outlet vent are positioned at opposite ends of the same cupboard space 3 Fit t...

Страница 14: ...xillary water heater It is intended to provide pre heating of water before it enters the Zip HydroTap G4 boiling tank The Booster is supplied with the BCSHAV model However it may be later installed as...

Страница 15: ...tlet connections on top of the Booster The hot water outlet hose must be thermally insulated with the insulation provided Tilt Forward Lift UP Release NOTE Remove the backing plate for wall mounting 3...

Страница 16: ...rom the Bypass Out fitting to the water inlet of the booster unit Marked Blue and from the outlet of the booster unit Marked Red to the Bypass IN fitting on the Zip HydroTap unit Avoid exerting any me...

Страница 17: ...water before re applying Do not force the seal to fit Turn the regulator OFF by rotating the regulator knob all the way out in an anti clockwise direction NOTE Two plastic seals are supplied with a ne...

Страница 18: ...bar 3 Inspect the joint for leaks 4 If any bubbles appear the joint will need to be resealed CO2 Regulator 4 5 Leak Test This gauge shows the pressure in the bottle and indicates when the bottle is em...

Страница 19: ...and removal Be careful when cutting the poly tube so that there are no rough edges and that the tube is not distorted 1 Use a sharp knife to ensure the tube has a clean straight edge Do not cut at an...

Страница 20: ...SS IN VENT BYPASS OUT SPARKLING OUTLET CO2 IN WHITE Note Note All All silicon tubes silicon tubes must be cut to must be cut to size They must size They must have a constant have a constant fall back...

Страница 21: ...on the under sink unit close to the outlet tap within reach of the hose and cord lengths supplied Note The tube lengths are matched to the pumps performance and therefore CANNOT be lengthened RED CLEA...

Страница 22: ...D USB MAINS IN MIXER OUT MIXER IN BOILING OUT BYPASS IN VENT BYPASS OUT CHILLED OUTLET SPARKLING OUTLET CO2 IN Note Note All All silicon tubes silicon tubes must be cut to must be cut to size They mus...

Страница 23: ...T MIXER IN BOILING OUT BYPASS IN VENT BYPASS OUT CHILLED OUTLET SPARKLING OUTLET CO2 IN Note Note All All silicon tubes silicon tubes must be cut to must be cut to size They must size They must have a...

Страница 24: ...m long and the flush line stop cock Place the valve end of the flush line into the 10L bucket or container 6 2 Filter Flush Section 6 Commissioning 6 1 CO2 Purge 1 Press the START button to commence t...

Страница 25: ...the system will commence the Boiling calibration procedure This will take aprox 5 6 minutes Upon completion a Booster reminder screen will appear and allow you to return home by pressing the Home but...

Страница 26: ...y sensor 1 With the unit in Normal operating mode and with the safety enabled 2 Turn the power OFF 3 Pull both tap levers to the forward position 4 Turn ON the power 5 The unit will calibrate the safe...

Страница 27: ...service Heater fuse driver fault Internal fault Call Zip Service Heater driver fault No hot water Call Zip Service Compressor driver fault No chilled water Call Zip Service Hot sensor degraded Intern...

Страница 28: ...412 AU635979 GB0422305 GB2065848 US4354049 US5103859 US5099825 and SA2006 08043 Other patents are in force and patent applications are pending Head Office Zip Heaters Aust Pty Ltd ABN 46 000 578 727 6...

Отзывы: