Page 14 of 20
Zip HydroTap Installation and Operating Instructions - 82872 - July 2003
Step D - Connecting the water supply (all models)
To prevent sediment from entering the Zip HydroTap at connection, flush
water through the supply thoroughly before connection to the HydroTap.
Open the access door and check that the filter is in place and secure.
Connect water supply to undersink unit using flexible hose already
attached.
Step E - Testing and commissioning
Check that all installation steps have been carried out correctly
Locate the red fill switch on the upper left-hand side of the undersink unit
and check that it is in the Fill (Up) position.
Connect the undersink unit to the power and turn the power and water on.
Check that the tap-head lamps operate according to the model as follows:
Models ABC and ABB: All three lamps on
Model ABA: Lamps 1 and 3 on, lamp 2 off
Model B: Lamps 1 and 2 on, lamp 3 off
The boiling water tank is now filling and after a short time, water will start
to flow from the tap. Allow the water to flow for five minutes to charge the
filter and ensure clean clear water. Allow sufficient water to flow through
the filter to clear the water of carbon fines.
Set the Fill switch to the On (down) position. The water will stop flowing.
For Model ABC, press and hold the blue button for about 1 minute after
water begins to flow.
Check that the lamps operate according to the model as follows:
Model ABC: Lamps 1 and 2 flash once per second and lamp 3 flashes once
per minute
Model ABA: Lamp 1 flashes once per second, and lamp 3 flashes once per
minute.
Model ABB: Lamp 1 flashes once per second, lamp 2 stays on, and lamp 3
flashes once per minute.
Model B: Lamp 1 flashes once per second and lamp 2 stays on.
Check all connections for water leaks, rectify as necessary.
Write the date on the filter cartridge (all models except model B).
After approximately 15 minutes, lamps which were flashing (lamps 1 and/or
2) will stop flashing and stay on to indicate that the water has reached the
correct temperature. Lamp 3 will continue to flash once per minute.
Test Water delivery from the tap checking for appropriate temperatures.
Use cable clips to tidy and secure wiring.
If required for Model ABC, set up the energy saver timer as detailed on page 13.
Installation procedure continued
Water connection
Stop
cock
Flexible
hose
Fill switch location
Tap head lamps
Lamp 3
Lamp 2
Lamp 1
Chilled (Model ABC) or ambient
(Model ABA) water button
Boiling water
button
On models ABB and B
both buttons dispense
boiling water
Electrical Connection
Cold Supply
Hot outlet
Vent