25
805812 v1.05 06.20 HydroChill Install Instructions
Operation
Operation
The HydroChill Tap Font has a tap handle to dispense each type of
water:
• Still ambient and still chilled water (HCF models)
• Still ambient, still chilled and sparkling chilled water (HCS models)
Pull the tap towards you to dispense water. When released, that tap
handle springs back to the "off" position.
To dispense water continuously to fill large vessels, push the tap
handle forwards. The tap must be manually returned to the OFF
position.
Stopping the HydroChill
If the HydroChill is to be left unused for a long period, disconnect
the plug from the electricity mains. Turn off the water supply and
the valve of the CO
2
bottle. Protect from heat and bad weather. Keep
covered to protect from dust and/or splashes.
Sanitise the system and flush the filter before resuming operation.
Moving the HydroChill
Before moving the HydroChill, the ice bank must be emptied.
1. Disconnect power and water.
2. If ice has formed, allow 12 hours for the ice to melt.
3. Empty the water from the ice bank:
• 80L models: Detach the water level indicator tube from the rear
of the unit. Allow water to drain. Refit the tube.
• 60L and 150L models: Open the top cover and use an external
pump to extract water from the ice bank tank. Refit the cover.
If the machine needs to be shipped or stored:
The system must be sanitised (see page 27) and all water must be
removed; very low temperatures may freeze any residue of sanitiser
solution or water and may damage internal components.