13
INSTALLATION INSTRUCTIONS & USER MANUAL
T210013 V1.00 FEB 2018 -ZIP HYDROCHILL 20
TECHNICAL SUPPORT
TEL: 0345 6 005 005 EMAIL: SERVICE@ZIPINDUSTRIES .CO.UK
WWW.ZIPWATER.CO.UK
INSTALLATION
Siting the product
• Wear safety gloves when handling the
HydroChill.
• Site the HydroChill away from sources
of heat.
• Ensure surface is level.
• Leave at least 10 cm around the
HydroChill to allow for adequate
ventilation.
• Sanitise the HydroChill before first use
see page 24.
• Tighten the tap knobs, (BT models)
and position the drip tray
(4)
.
Filling the ice bank
• Fill with wholesome (cat 1) water via
the rear fitting
(1)
.
• Stop filling the ice bank once you
reach the max level
(2)
on the ice
bank level pipe
(3)
.
• If you exceed the limit, water comes
out from the frontal drip tray
(4)
.
• Once you have filled the ice bank,
avoid moving the HydroChill.
• If you have to move the HydroChill,
remember to empty the ice bank first.
Emptying the ice bank
Empty the ice bank through the
ice bank
level pipe
(3).
1
2
3
4