background image

Page 6 of 12 

Zip CH103, CH104 - Installation & operating instructions - 82127UK - June 2015 v1.04

Heavy Duty ChillTap

®

Outlet

Inlet

Chiller unit

Filter and 

head 

assembly

 Mains cold water

15mm compression 

fitting

Pressure limiting 

multifunctional valve

CH103 and CH104 configuration diagram

Note

s

Ensure that the plastic pipes from the chiller unit are insulated with the 
tube insulation provided, use any tube insulation left over to insulate

pipes from the filter head.

Cut pipes should not be overly long, but must allow sufficient length to 

avoid stress at connection points.

CH103 ChillTap

®

 installation instructions 

continued

Connect the blue tube from the tap to the push fit fitting marked OUTLET on the 
top left rear of the chiller unit, trim to length before fitting. 

Connect the white tube (supplied in the tap kit) between the INLET connection 
on the filter head (marked with arrow pointing towards the filter head) to the 
pressure limiting multifunction valve, trim to length before fitting.     

Use the 4off pipe clamps and 4off 1/2” self tap screws provided to secure 
tubes appropriately, to prevent applying stress to pipe connections.

260mm min.

Содержание Chilltap CH103

Страница 1: ...ions 82127UK June 2015 v1 04 Installation and operating instructions Zip ChillTap and Wall Fountain Under counter chiller and wall recessed chilled water systems Affix model number label here Model CH...

Страница 2: ...be carried out by a competent installer who will then be responsible for adhering to all relevant standards and regulations Appliance to be wired to a double pole switched fused spur with a minimum br...

Страница 3: ...ssories Spare parts Part No Description SP99249 Heavy duty ChillTap ZT502 Sub micron filter Optional accessories Part No Description HE45004 Water block water shut down system ZI001 Bubbler non vented...

Страница 4: ...ic tubing to prevent it from kinking or crushing around a bend The plastic tubing contains water under mains pressure be careful not to nick scratch or damage it during installation Cut the tube squar...

Страница 5: ...ming water supply line Note Before assembling the compression fitting to the valve apply sufficient PTFE tape to the thread to ensure a water tight connection Do not turn the water on until the comple...

Страница 6: ...pes should not be overly long but must allow sufficient length to avoid stress at connection points CH103 ChillTap installation instructions continued Connect the blue tube from the tap to the push fi...

Страница 7: ...the bottom of the unit Check that there is enough free space within the wall to allow for completely recessing the Wall Fountain The top half recesses 270mm and the bottom half requires a depth of 350...

Страница 8: ...the sink bowl to an appropriate waste in accordance with local by laws Keep the drainage piping clear of the chiller space approx 380mm above the base tray Connect to water supply Install an isolatio...

Страница 9: ...anging the filter For safe operation the filter cartridge should be replaced at least every 6 12 months or earlier if you notice a persistent reduction in water pressure from the tap or an unpleasant...

Страница 10: ...for service check that both the water and electricity supplies are turned on and functional Call Zip a qualified electrician or plumber for assistance service spare parts or enquiries Zip customer se...

Страница 11: ...mption Zip does not exclude restrict or modify any liability that cannot be excluded restricted or modified or which cannot except to a limited extent be excluded restricted or modified as between the...

Страница 12: ...orfolk NR19 1TE www zipheaters co uk Telephone 0845 6 005 005 0345 6 005 005 Fax 01362 692448 Web www zipheaters co uk e mail info zipheaters co uk Registering Your Purchase Registering your Zip insta...

Отзывы: