Zip AP3/05 Скачать руководство пользователя страница 6

6. If required a Temperature and Pressure relief valve (accessory AQ1) can be 

used with any installation by fitting securely into the locating point provided.

7. The 6 bar expansion relief valve must be fitted on the cold water supply.

Under no circumstances should the expansion relief valve be installed in an 
inverted position as fouling of the seat caused by deposits may prevent it
from operating correctly.

Safety relief valve connections should not be used for any other purpose
and no valve should be fitted between the expansion relief valve and the
storage cylinder.

8. The drain connection from the expansion relief valve and the T&P valve, if 

fitted, must be in accordance with Water Supply Regulations. The point of 
discharge must be in a safe and visible position. The connection should be
made using 15mm pipe having a continuous fall to a maximum length of 3
metres. It shall not have more than 3 right-angled bends. If a waste
connection in excess of 3 metres is necessary the pipe diameter should be
22mm with continuous fall and no more than 4 right-angled bends with a
maximum resistance to flow equivalent to 9 metres of straight pipe.

9. An isolating valve must be fitted to the cold water supply.

10. Valves and fittings must be of a type required by Water Supply Regulations

Positioning

1. The Zip Aquapoint must be installed vertically. The connections should be

at the rear of the unit. When facing the heater the hot supply (red) is to
the left, and the cold feed (blue) to the right.

2. The heater may be mounted above or below the intended outlets providing

the water connections for the undersink models are at the top and for the
oversink models underneath. 

N.B. Undersink and oversink models are

not interchangeable. 

The fixings must be capable of supporting the heater 

when full of water.

3.  The undersink unit can be placed unsupported on the floor or cupboard 

base, but if additional support is required, securing screws are supplied that 
locate to the rear of the casing.

4. Position the Zip Aquapoint to allow for its removal for future inspection and

maintenance.

5. The Zip Aquapoint is not recommended for installation above false ceilings.

6. Do not install in a location where the unit or connecting pipe work can freeze.

AP3/05, AP3/10, AP3/15 Installation Instructions                                               

7  

New Aquapoint lll qxd:New Aquapoint lll qxd  5/11/08  15:51  Page 6

Содержание AP3/05

Страница 1: ...The terms Zip and Aquapoint are registered trademarks Zip products described in the brochure are manufuctured under one or more of the following patents AU675601 AU637412 AU635979 GBO422305 GB2065848...

Страница 2: ...tion 12 Fault Finding 13 Warranty 14 Installation must only be undertaken by a competent person familiar with unvented electric water heaters The Zip Aquapoint must be installed in accordance with the...

Страница 3: ...nt Approvals Zip Aquapoint III complies with LVD and EMC directives and is CE endorsed Zip Aquapoint III has been exam ined tested and found when correctly fitted to comply with the requirements of th...

Страница 4: ...602 4533 The Zip Aquapoint is an unvented water heater designed for connection directly to the incoming mains water supply and can serve one or more outlets using conventional taps Care should be take...

Страница 5: ...nstallation If in doubt or in need of further guidance please call Zip Customer Service on 0845 602 4533 2 Zip Aquapoint unvented water heaters must be installed by a competent installer familiar with...

Страница 6: ...with a maximum resistance to flow equivalent to 9 metres of straight pipe 9 An isolating valve must be fitted to the cold water supply 10 Valves and fittings must be of a type required by Water Supply...

Страница 7: ...l shown Diagram 1 Inlet pressure less than 4 bar and expanded hot water can be accommodated in the pipe work Diagram 2 Inlet pressure less than 4 bar but expanded hot water cannot be accommodated in t...

Страница 8: ...d water supply pipe work as shown in diagrams 1 to 3 7 Flush all pipe work thoroughly before making the final connections to the valves accessories and cold feed to the heater to ensure that any debri...

Страница 9: ...to ensure free water flow through the discharge pipe by turning the knob to the left and holding in the open position 9 Set the temperature control knob to the desired position The E position with a...

Страница 10: ...space or any other concealed location If there is any sign of leaks or seepage the heater should be isolated from the water supply and switched off from the electrical supply until a competent person...

Страница 11: ...unscrewing the element assembly and removing it If the anode is badly corroded it should be replaced after removing it by grasping with long tongs or other suitable tool through the flange opening wh...

Страница 12: ...aulty element Thermostat failure Solution Reset If the cut out operates again isolate the unit and contact the installer NB Isolate the electrical supply before removing the electrical cover panel and...

Страница 13: ...and re installation of any component of the appliance if it needs to be returned for repair to Zip or its Distributor This warranty does not cover damage resulting from non operation of the appliance...

Отзывы: