Schematic of a standard installation of the centred Anchor 
Point with the four pre-assembled grids (à 1.00 × 1.33 m). 

Installation with obstacles 

2.67 m

2.00 m

Fall Edge

 

min. 

2.50 m

Installation Manual

By moving the individual grid elements around, rising building 
elements or ventilation shafts, drains etc. can be embedded. 

Please note that the anchor point must not be positioned in 

either of the two outside grid rows. In addition, the Anchor Point

 

must be placed in the centre of a grid element (0.33 × 0.33 m).
In the stress direction, at least 20 grid elements must be behind 
the Anchor Point. We recommend having ZinCo plan and 
inspect such non-standard installation situations. 

3.1 Completion, identification label

Please ensure that all works have been carried out satisfactorily 
and that the identification label can easily be seen and read. 
Only anchor devices that have an identification label may be 
used. 

2.67 m

Schematic (standard)

 

Fall Edge

 

Cover with bulk material 

to

 e

xt

e

n

d

 

at least 50 cm beyond the grid

48 grid elements  
à 0.33 x 0.33 m  

 

Anchor Point

mind. 

2.50 m

2.00 m

3.2 Installation documentation

The installation documentation is proof for the client that the 
installation has been carried out correctly and professionally. 
This documentation is also an essential basis for subsequent 
inspections of the Fallnet anchor device(s). A copy of the 
installation documentation is available in PDF from the 
manufacturer. On completion of installation, copies of the 

document are to be given to the client and are to be retained 

on the property for subsequent inspections of the Fallnet.

The following information is a minimum requirement for the 

installation documentation:

- address of property
- installation company
- technician responsible for installation
- fallnet serial numbers
- details of load (which bulk material, load weight, include

 

delivery note, if relevant)

- installation plan (please include serial numbers here too)

The installation plan should be affixed to the building where it 
is clearly visible, e.g. at the roof access point.
Statement issued by the technician responsible for installation 

(signature): 

- the Fallnet installation manual was adhered to
- installation was carried out as planned
- minimum load requirements have been adhered to
- photo documentation, in particular of details that are no

longer visible after installation.

3.3 Handing over the Fallnet

®

 SR documentation to 

the client/ owner

The delivery scope includes the following documents, which 

the installer must hand to the client:  

- Installation Manual and Instruction Manual
- Inspection chart. Please record the serial number of the

Fallnet

®

 SR in the chart. This number can be found on

the identification label attached to the product. Fallnet

®

 SR

must be inspected regularly.

In addition, the following must be given to the client:

 

- Installation documentation
- Site plan

3.4 Queries

Should you have any queries, or be unsure about the correct 
use/installation of the product or require further detailed 
information for your own specific building project, please 
contact ZinCo GmbH.

Содержание Fallnet SR

Страница 1: ...Fallnet SR Installation and Instruction Manual and Inspection...

Страница 2: ...d min 110 kg m 3 The grid must fully cover the base plate and the vertical locking tabs must engage the adjacent elements Installation Manual Page 3 Instruction Manual Page 5 Details on Manufacturer P...

Страница 3: ...at the bulk material to be used as the load on the Fallnet SR extends at least 50 cm beyond all four edges of the grid elements Important The Fallnet SR must always be in direct contact with the load...

Страница 4: ...installation documentation is available in PDF from the manufacturer On completion of installation copies of the document are to be given to the client and are to be retained on the property for subs...

Страница 5: ...nly be used for a roof pitch of maximum 5 it must only be installed on a suitable subsurface i e either on a filter sheet multi course build up or on a protection mat or layer single course build up s...

Страница 6: ...fall is prevented or a swinging fall does not result in impact Prior to use an emergency plan must be available in which all possible occupational emer gency situations are addressed At the request of...

Страница 7: ...carried out by suitably qualified personnel who have been authorised by the manufacturer and are to be recorded on the rear side of this inspection chart The following inspection works are required vi...

Страница 8: ...Inspection Chart Fallnet SR Overview of documentation and plan of inspection works Building Inspection Date Address Authorised company person Comments reason for inspection defects identified repair...

Отзывы: