Zinco Fallnet SR Скачать руководство пользователя страница 3

ZinCo GmbH ∙ Lise-Meitner-Strasse 2 ∙ 72622 Nuertingen ∙ Germany 
Phone +49 (0) 7022 6003-0
Email: [email protected] ∙ www.zinco-greenroof.com

3

1.33 m

1.00 m

6

5

- Load bearing element (2.00 x 2.67 m) consisting of four

pre-assembled grids to hold the load.

Important:

We would like to state explicitly that, regardless of product 
liability, ZinCo shall only assume liability for the consultancy 
process where installation has been carried out in line with 
ZinCo planning. Installation without planning carried out by 
ZinCo is at your own risk. Regardless of this, the installation 
manual and instruction manual must be observed. 

 

Please check the following prior to installing the anchor device 
Fallnet

®

 SR:

 

0.1 Delivery scope / condition of the system components 

Check: 

that the shipment is complete and in perfect condition.

Important: 

 

incomplete, faulty or incorrect shipments should 

be reported immediately.

The delivery scope per Fallnet

®

 SR consists of:

- anchor point:

Installation Manual

1. Base plate with

vertical locking tabs

2. Support
3. Anchor eye
4. Identification label

4

3

1

2

5. Four pre-assembled

grids à 1.00 × 1.33 m

6. Marker and device

for correctly

positioning the
single anchor point

0.2 Check the situation before installation

 

Prior to installation please check that the roof construction is 

sufficiently dimensioned for the required loads, waterproofing 
and if required root barriers are in place and the actual sub-

 

base for the Fallnet

®

 SR is properly and evenly laid and is not 

steeper than 5 degree (=8,8 %). If you are in any doubt, please 
clarify prior to installation. The surface must be free of dirt, oil 
and moss or lichen prior to installing Fallnet

®

 SR. If necessary, 

sweep the surface.

0.3 General points

 

The Fallnet

®

 SR  can be installed, for example, 

- On the protective layer above the waterproof layer

(e.g. ZinCo protection mat SSM 45 with single-course
green roof or ZinCo Filter Sheet TG with a gravel roof)

- Please ensure that there are no objects (e.g. concrete

slabs) in the area of the Anchor Point (radius of at least 0.5 m

 

- on the filter sheet (e.g. for multi-course green roof)
- Also ensure that the bulk material to be used as the

load on the Fallnet

®

 SR extends at least 50 cm beyond

all four edges of the grid elements

Important:  

The Fallnet

®

 SR must always be in direct contact with the 

load (bulk material)! It must, therefore, be filled and covered 
completely with suitable bulk material (UV protection!). 

Zincolit or ZinCo system earth, gravel or some other similar 
bulk material can be used. Must only be installed on roofs 
with a pitch of a maximum 5 degrees ( = 8.8 %)!

The required load (dry weight) for Fallnet

®

 SR is at least 

110 kg/m²

. This is to be increased to 130 kg/m² if the roof 

pitch is greater than 2° (3.4 %) and it is possible to fall in the 
direction of the slope.

Where the Fallnet

®

 SR is to be incorporated into a green roof, 

a min. 300 mm wide gravel strip should be left all around the 
Anchor Point, so that it is easier to see.

1.1 Measuring The Anchor Point

Measure out the position of the Anchor Point using a roof site 
plan. Please ensure that the anchor eye is positioned at a 
distance of at least 2.50 m from the roof edge.  

1.2 Connect marked grid with Anchor Point

Place the punched opening in the middle of the coloured 

element of the pre-assembled grid (1.00 × 1.33) over the 
anchor point. Gently click into place using your foot, so that 
it fully covers the base plate and the vertical locking tabs on 
the base plate engage behind the outer bar of the adjacent, 
black grid. 

1.3 Positioning the grid and Anchor Point

The grid and anchor point are positioned over the measured 
point (see 1.1).

1.4 Connecting all four grids to each other

Then, connect the other three grids in such a way that the 
Anchor Point is in the centre of the connected grid area. The 
four pre-assembled grids provide a base area of about 5.3 m² in 
total. The Fallnet

®

 SR must be placed fully on a level surface, 

all connection points must be clicked into place. The connec-
tion points can be separated again using a hammer. Faulty 
elements must be replaced.

1.5 Applying the required load

The installed Fallnet

®

 SR is now filled and covered with the 

load (e.g. ZinCo System Substrate or gravel), for requirements 
see item 0.3 General Points. 

2. Adapting to building-specific features

With Fallnet

®

 SR, the form (2.00 × 2.67 m) specified in the

Standard can be adapted to suit the particular building
situation, where necessary.

Содержание Fallnet SR

Страница 1: ...Fallnet SR Installation and Instruction Manual and Inspection...

Страница 2: ...d min 110 kg m 3 The grid must fully cover the base plate and the vertical locking tabs must engage the adjacent elements Installation Manual Page 3 Instruction Manual Page 5 Details on Manufacturer P...

Страница 3: ...at the bulk material to be used as the load on the Fallnet SR extends at least 50 cm beyond all four edges of the grid elements Important The Fallnet SR must always be in direct contact with the load...

Страница 4: ...installation documentation is available in PDF from the manufacturer On completion of installation copies of the document are to be given to the client and are to be retained on the property for subs...

Страница 5: ...nly be used for a roof pitch of maximum 5 it must only be installed on a suitable subsurface i e either on a filter sheet multi course build up or on a protection mat or layer single course build up s...

Страница 6: ...fall is prevented or a swinging fall does not result in impact Prior to use an emergency plan must be available in which all possible occupational emer gency situations are addressed At the request of...

Страница 7: ...carried out by suitably qualified personnel who have been authorised by the manufacturer and are to be recorded on the rear side of this inspection chart The following inspection works are required vi...

Страница 8: ...Inspection Chart Fallnet SR Overview of documentation and plan of inspection works Building Inspection Date Address Authorised company person Comments reason for inspection defects identified repair...

Отзывы: