
Operations Manual | 11
Power Sequencing
a. Power up the system by turning ON the 120Vac to the UPS Battery Cabinet. Make sure the BMS ON/OFF switch on
inside of cabinet door is turned ON.
•
Allow 1 minute for the BMS to initialize.
b. Log into the Web interface and verify that the BMS is Online.
•
For Cloud Server option refer to item 1.
•
For local server refer to the BX50 Manual for how to connect.
•
For MODBUS TCP/IP refer to the MODBUS Dictionary.
1. Browse to : https://manage.anzenbms.com/
2. Login using your assigned login. (Example: [email protected])
3. Select the Assigned Systems tab and then select the cabinet which is being monitored.