INSTALLATION AND OPERATING INSTRUCTIONS:
2-jaw parallel gripper, hybrid, HRC-04 series
12
DDOC00269 / d
EN / 3/31/2020
Zimmer GmbH
●
Im Salmenkopf 5
●
77866 Rheinau, Germany
●
+49 7844 9138 0
●
+49 7844 9138 80
●
www.zimmer-group.com
7. Installation
7.1 Safety notes
NOTICE:
Switch off the energy supply for the electronics before any assembly, installation or maintenance work.
►
Electronics may get damaged.
CAUTION:
Switch off the energy supply for the electronics before any assembly, installation or maintenance work.
►
Injuries are possible.
WARNING:
Risk of injury in case of unexpected movement of the machine or system into which the gripper is to be
installed.
►
Switch off the power supply to the machine before all work.
►
Secure the machine against being switched on unintentionally.
►
Check the machine for any residual energy.
7.2 Installing the mechanical system
7.2.1 General installation information
NOTICE:
LED ring must be perfectly flush with each other before tightening the grub screws (“IO-Link”).
Non-compliance may result in material damage.