ZGR SOLAR STR 250
Operation manual
www.zigor.com
14
Fig. 4-4 Clearance around the ZGR SOLAR STR 250
In case of multiple inverters, reserve speci
û
c clearance between the inverters (Fig. 4-5).
Fig. 4-5 Clearance around multiple inverters
In case of back-to-back installation, reserve speci
û
c clearance between the two inverters (Fig. 4-6).
Fig. 4-6 Clearance between the two inverters back-to-back
Install the inverter at an appropriate height for ease of viewing LED indicators and operating switches.
Moving the ZGR SOLAR STR 250
4.3
Move the inverter to the speci
û
ed position before installation. The inverter can be moved manually or via a hoist.
4.3.1
Manual Transport
Use the handles on the backplane and base to transport the inverter to the destination.
CAUTION
Inappropriate moving operation may cause personal injury!
It is recommended that at least four installers carry the inverter together and wear protective equipment such as
smash-proof shoes and gloves.
Always beware of the gravity center of the inverter and avoid tipping.