INSALLATION / OPERATION
23
Fig. 9
Clearing bar (optional)
For improved levelling and more intensive
crumbling, the seedbed combination can be
optionally equipped with a spring-loaded
clearing bar with either a smooth or toothed
bar.
The height of the bar can be continuously ad-
justed via a spindle and can also be operated
in two positions.
Fig. 10
In light soil conditions, we recommend mount-
ing the clearing bar in draft position.
−
Dismantle the screws (pos.2).
−
Loosen the screws (pos.1) a little.
−
Pivot the clearing bar.
−
Insert the screws (pos.2) in the hole.
−
Tighten the screws.
Fig. 11
1