8900-A2-ZZ40-50
8965, 8968, 8975, and 8985 Access Cards
13
6
Dress the cables toward the nearest rail and fix them with cable ties.
Optionally, use front cable management brackets (feature number
PDN-8900-F1-001) to hold and direct the cables, as shown below. See the
8820 Front Cable Management Bracket Installation Instructions
for more
information.
7
If ferrite chokes are supplied with your access card, clamp them around
the cables as close as possible to the card. If they fit loosely around the
cables, fasten them with cable ties.
8
For a card without POTS service, attach the other ends of the cables to the
appropriate MDF or demarcation point. A converter may be necessary for
terminating the other end of the cables on a punchdown block before
cross-connecting to an MDF.
For a card with POTS service, attach the other ends of the cables to the
DSL interface of your POTS splitter. Refer to the document that came
with the POTS splitter for the additional connections.
04-17516
ADS
L2+
896
8
OK
Alrm
Te
st
1/25
2/26
11
/35
12/36
13/37
14/38
23/4
7
24/48
25 - 48
1 - 24
SYS
TEM
25-4
8
1-2
4
ADS
L2+
896
8
OK
Alrm
Test
1/25
2/26
11/35
12/36
13/37
14/38
23/4
7
24/48
25 - 48
1 - 24
SYS
TEM
25-
48
1-2
4
ADS
L2+
896
8
OK
Alrm
Te
st
1/25
2/26
11/35
12/36
13/37
14/38
23/4
7
24/48
25 - 48
1 - 24
SYS
TEM
25-
48
1-2
4
ADS
L2+
896
8
OK
Alrm
Te
st
1/25
2/26
11/35
12/36
13/37
14/38
23/4
7
24/48
25 - 48
1 - 24
SYS
TEM
25-
48
1-2
4
ADS
L2+
896
8
OK
Alrm
Test
1/25
2/26
11
/35
12/36
13/37
14/38
23/4
7
24/48
25 - 48
1 - 24
SYS
TEM
25-4
8
1-2
4
ADS
L2+
896
8
OK
Alrm
Test
1/25
2/26
11/35
12/36
13/37
14/38
23/4
7
24/48
25 - 48
1 - 24
SYS
TEM
25-
48
1-2
4
ADS
L2+
896
8
OK
Alrm
Test
1/25
2/26
11/35
12/36
13/37
14/38
23/4
7
24/48
25 - 48
1 - 24
SYS
TEM
25-
48
1-2
4