
74
*Attention
Please do not touch the metal parts of testing probe with your fingers while
measuring voltage, or you will be shocked. Please take care.
2.3.3 Trigger
* Attention
Inspect when spark plug is installed on the cylinder head
and compression pressure is normal.
Disconnect connector 4P and 2P from CDI assembly. A
peak-voltage shunt is connected between the 4P connector
(black terminal) on trigger (blue/white terminal) for 2P
connector of wiring-terminal. Press starter motor button or
kick pedal level to measure primary peak voltage of trigger.
Connecting method: positive to blue/white, negative to
green/white.
Min. voltage: higher than 1.7V.
*Attention
Please do not touch the metal parts of testing probe with
your fingers while measuring voltage, or you will be
shocked. Please take care.
When the peak voltage measured at connector of CDI
assembly is abnormal, take down the protecting plate on the
right side of vehicle and remove connector of magneto. The
trigger (blue/white) is connected with a shunt.
• When the measured voltage at CDI assembly terminal is abnormal, but measured voltage at
magneto terminal is normal, it indicates that the connector is of poor contact or wiring is broken.
• When measured results at both sides are abnormal, the trigger is damaged. Please check with a
reference to items listed in Diagnosis Table
白2(A)
白1(A)
白(A)
Ω
蓝/白
白/绿
白2(A)
白1(A)
白(A)
(10
0)
Содержание RKV 200
Страница 1: ...1 RKV 200 Motorcycle Service Manual...
Страница 12: ...12 Figure 1 3 Figure 1 4 Figure 1 5 Figure 1 6 Figure 1 7 Figure 1 8 Figure 1 9 Figure 1 10 Handle...
Страница 18: ...18...
Страница 44: ...44 Symptom Electric horn mutes Diagnosis procedures...
Страница 128: ...128 Swingarm Cam mechanism Piston Oil filter Engine oil pump Engine oil filtration net Cranksha ft...
Страница 143: ...143...
Страница 144: ...144...
Страница 158: ...158 Gearshift drum Shifting fork Shift rail Principal shaft assembly Vice shaft assembly...
Страница 171: ...171 Complete QJ200 2A Schematic Circuit Diagram...