Start-up procedure for parallel system
1.
Connect parallel cable, input/output cable, and battery cable well; modify the parallel board jumpers
correctly.
2.
Measure the positive and negative battery pack voltage. Battery switch is opened temporarily.
3.
Switch ON the output switch at the front door.
4.
According to the start-up procedure for single unit, set the operation mode of each UPS: single mode is
changed to parallel mode; set the parallel number for each UPS; up to 6 units can be parallel; set the ID of
each cabinet, the ID of each unit must be different.
5.
Switch ON the input switch. Close the external input switch and start from mains.
6.
After start from mains, check the LCD interface of each UPS to see if the ID, VA is the same with the
actual values.
7.
Switch ON the external battery switch of each UPS. Check if the charging current displayed in LCD is
normal.
WARNING
Wait for about 5 minutes for the internal DC bus bar capacitors to be completely discharged.
NOTE
The UPS cannot be parallel until each single unit is normal.