Installation and Operating Instructions V02
63
10.7 Tools and torque
Tools and torque required for installation and electrical connections.
Tools, model
Object
Torque
Torque screwdriver,
T25
Screws for the cover
2.2Nm
Screw for second protective grounding
connection
Screws for tightening the inverter and wall
bracket
Flat-head screwdriver,
blade with 1×5.5mm
Screw terminal block for AC cable
1.2Nm
Flat-head screwdriver,
blade with 3.5mm
Sunclix DC connector
Antenna
Hand-tight
Socket
wrench
Open end of 30 Swivel nut of M25 cable gland
Hand-tight
Open end of 24 Swivel nut of M20 cable gland
Hand-tight
Open end of 15 Swivel nut of sunclix connector
2.0Nm
Open end of 10 Hex bolts for wall bracket
Wire stripper
Peel cable jackets
Crimping tools
Crimp power cables
Hammer drill,
drill bit of Ø10
Drill holes on the wall
Rubber mallet
Hammer wall plugs into holes
Cable cutter
Cut power cables
Multimeter
Check electrical connection
Current clamp
Marker
Mark the positions of drill holes
ESD glove
Wear ESD glove when opening the inverter
Safety goggle
Wear safety goggle during drilling holes.
Anti-dust respirator
Wear anti-dust respirator during drilling
holes.
Содержание Zeverlution 1500S
Страница 1: ......