PREMIER AD USER MANUAL, MAINTENANCE GUIDE & LOG BOOK
Approved Document No: GLT.MAN-106
PAGE 24
Issue: 1.02
Authorised: GH Date: 15/03/2004
I/we being the competent person(s) responsible (as indicated by my/our signatures below) for the
acceptance of the fire alarm system, particulars of which are set out below, ACCEPT the system
on behalf of:
Name (in block letters):
Position:
Signature:
Date:
For and on behalf of:
Address:
Postcode:
The extent of liability of the signatory is limited to the system described below.
Extent of the system covered by this certificate.
Certificate of Acceptance for the Premier AD Fire Alarm System installed at:
Address:
The following work is required before the system can be accepted:
All installation work appears to be satisfactory.
The system is capable of giving a fire alarm signal
The facility for remote transmission of alarms to an alarm receiving centre operates correctly.
(Delete if not applicable)
The following documents have been provided to the purchaser or user:
“As fitted” drawings.
Operating and maintenance instructions
Certificates of Design, Installation and Commissioning.
A log book.
Sufficient representatives of the user have been properly instructed in the use of the system,
including, at least, all means of triggering fire signals, silencing and resetting the system, and
avoidance of false alarms.
All relevant tests, defined in the purchasing specification, have been witnessed.
(Delete if not applicable.)