12 COMMISSIONING THE SYSTEM, INCLUDING P.S.E. 

 

 

The commissioning of this fire alarm system should be performed by a qualified commissioning engineer, who has 
an understanding of sections 2,3,& 4 of BS5839 pt 1:2002 (i.e. Design considerations, Limitations of false alarms, 
Installation recommendations) 

 

 

The system layout drawing should be checked for accuracy & stored in a safe place, accessible to any fire officer. 

 

 

The system set-up data chart (GLT.MAN-110, section 9) should be checked for accuracy. 

 

 

The fire alarm log book contact details should be checked for completeness.  

 

 

The insulation of cables should be checked in accordance with BS5839 Pt1: 2002 clause 38.2 for compliance. 

 

 

The Earthing should be checked in accordance with BS5839 Pt1: 2002 clause 38.2 for compliance. 

 

 

The PSE mains feed from a 3A spur should be checked

. It should be protected by an over current device (MCB) 

NOT an earth leakage device (RCD). 

 

 

The PSE Charger voltage should be checked & adjusted if necessary (28.3 with batteries disconnected). 

 

 

The battery voltage should be checked (should be between 24 & 27V) 

 

 

All call points & detectors can signal an alarm condition and indicate the correct zone (and text message) on the fire 
alarm panel. 

 

The Sound pressure level throughout the building should be checked for compliance with the recommendations of 
BS5839 Pt1: 2002 clause 16.2 

 

 

Any deviations from BS5839 Pt1 clause 7.2 should be listed in the Certificate of Installation & Commissioning. 

 

 

The Certificate of Installation & Commissioning should be completed, and the whole user manual passed to the 
relevant person on site. (They should be given a brief training on the basic operation of the FACP) 

 
 

12.1 DESIGN, INSTALLATION & COMMISSIONING CERTIFICATES 

 

The guidelines in BS 5839 Pt1: 2002 say that each stage of the system design and installation should have a separate 
certificate.  Before  this  User  Manual  is  handed  over  to  the  relevant  person(s)  on  site,  the  following  certificates  (or  the 
relevant  company’s  equivalent)  should  be  completed  by  the  system  designer,  the  installation  engineer  and  the 
commissioning  engineer.    The  System  Description  sheet  should  also  be  completed  on  Page  12  as  should  the  relevant 
parts of the Log Book section on Page 13. 
 
The  user,  or  responsible  person  should  then  complete  the  acceptance  certificate  to  acknowledge  that  they  have  been 
instructed  in  the  use  of  the  fire  alarm,  have  witnessed  that  it  is  operational,  and  have  been  given  all  the  relevant 
paperwork (drawings, log book, user manual, etc) 
 

 

 

Содержание Infinite 8

Страница 1: ...INFINITY 8 USER MANUAL MAINTENANCE GUIDE LOG BOOK Approved Document No GLT 201 7 2 Issue 1 2 Authorised Date 27 3 2012 FIRE ALARM CONTROL PANEL USER MANUAL MAINTENANCE GUIDE LOG BOOK...

Страница 2: ...ACP I E TO EVACUATE THE BUILDING 6 5 5 RESETTING THE PANEL 6 6 THE FAULT CONDITION 7 6 1 DIFFERENT TYPES OF FAULT 7 6 2 WHAT TO DO IF A FAULT CONDITION OCCURS 8 7 DISABLEMENTS 9 7 1 REASONS FOR DISABL...

Страница 3: ...arm or fault During an alarm the panel will start its sounders and indicate which zone has the fire It will also activate its auxiliary relay Fault Monitoring All circuits must be checked for line int...

Страница 4: ...orded with updated drawings operating instructions etc 47 2 i 10 Ensure that there are spare parts especially Call point elements held on site 47 2 j 1 2 With the Infinity 8 Range of Fire Alarm Panels...

Страница 5: ...g the Panel into the Accessed state see below 4 2 ACCESSED CONTROL AVAILABLE TO AUTHORISED USERS ONLY To avoid unauthorised changes to critical parts of the Fire Alarm System controls such as silencin...

Страница 6: ...er circuits GEN FLT SYSTEM FLT CONSTANTYELLOW CONSTANTYELLOW A processor fault has occurred To reset If problem persists consult your dealer GEN FIRE ONLY NOLED A manual evacuation has occurred The so...

Страница 7: ...ily pressing the button The Alarm Sounders will cease to sound but the light s for the Zone s in Alarm and the red General Fire light will stay lit The Auxiliary Fire relay will remain active The Pane...

Страница 8: ...em on a Zone or detector has been removed from its base It should be noted that any alarms raised on the fault zone s may not be recognised by the Fire Alarm Panel until the Fault Conditions have been...

Страница 9: ...ults are cleared the General Fault light will go out and the Panel s Internal Sounder will be silent if not already muted System Fault The System Fault LED and Gen fault lights when the Panel s micro...

Страница 10: ...ot be disabled External sounders can also be disabled as could be required in certain conditions 7 2 TO DISABLE A ZONE AND OR EXTERNAL SOUNDERS 1 Enter the access code default 1245 and press 2 Hold th...

Страница 11: ...efault 1245 Press button Press button again to deactivate sounder delay 8 3 HOW THE PANEL INDICATES SOUNDER DELAY If a Delay has been programmed into the Panel the General Disablement DEL AY LEDs will...

Страница 12: ...be left in test mode if the user needs to access another function e g disable 9 2 TO PROGRAMME ZONE IN TEST 1 Enter access code and press 2 Hold button for 3 seconds 3 Select the zone you want to go...

Страница 13: ...Circuits OUTPUT ROUTING INFORMATION TYPE OF OUTPUT CONNECTED WHAT HAPPENS WHEN ACTIVATED Auxiliary Output Yes No Fault Output Yes No ADDITIONAL INFORMATION Any additional information the User needs t...

Страница 14: ...ng work or panel conditions This LOG BOOK must be available for inspection at all times You can photocopy this log book to provide extra pages for when this book is full BS5839 part 1 recommends that...

Страница 15: ...MANUAL MAINTENANCE GUIDE LOG BOOK Approved Document No GLT 201 7 2 PAGE 14 Issue 1 2 Authorised Date 27 3 2012 MAINTENANCE WORK DATE TIME ZONE LOCATION REASON FOR WORK WORK CARRIED OUT ADDITIONAL WORK...

Страница 16: ...d Document No GLT 201 7 2 PAGE 15 Issue 1 2 Authorised Date 27 3 2012 FALSE ALARMS DATE TIME ZONE LOCATION CAUSE IF KNOWN OR ACTIVITIES IN ALARM AREA MAINTENANCE VISIT NEEDED YES NO MAINTENANCE FINDIN...

Страница 17: ...BOOK Approved Document No GLT 201 7 2 PAGE 16 Issue 1 2 Authorised Date 27 3 2012 ALL EVENTS OTHER THAN MAINTENANCE WORK OR FALSE ALARMS DATE TIME ZONE LOCATION DETAILS OF EVENT INCLUDING CAUSE IF KN...

Страница 18: ...ll points detectors can signal an alarm condition and indicate the correct zone and text message on the fire alarm panel The Sound pressure level throughout the building should be checked for complian...

Страница 19: ...h I we have been responsible complies to the best of my our knowledge and belief with the recommendations of section 2 of BS 5839 1 2002 for the system category described below except for the variatio...

Страница 20: ...uidance has been provided to the user to enable limitation of false alarms Other measures as follows INSTALLATION COMMISSIONING RECOMMENDATIONS It is strongly recommended that installation and commiss...

Страница 21: ...ed below and with the recommendations of BS5839 1 2002 except for the variations if any stated in this certificate Name Block Letters Position Signature Date For on behalf of Address The extent of lia...

Страница 22: ...e clause 7 All equipment operates correctly Installation work is as far as can be reasonably ascertained of an acceptable standard The entire system has been inspected and tested in accordance with th...

Страница 23: ...y this certificate All installation work appears to be satisfactory The system is capable of giving a fire alarm signal The facility for remote transmission of alarms to an alarm receiving centre oper...

Отзывы: