background image

Please take a few moments to check all pack contents listed on page 1 of the 
Assembly Instructions. 

Please contact “Zest4Leisure” directly if any of the pack contents are damaged 
or missing. Contact telephone: 01352 752 555 Option 1 or email: 
[email protected] 

Assembly requires 2 persons. All screw holes to be pre-drilled. 

Tools required: Corded/Cordless Drill, Pozidrive Bit/Screwdriver, 3mm Drill Bit. 

Snowdon Obelisk is now complete. 

1.

   Align two Trellis Panels (A) together as shown in Fig 1a.  Ensuring that predrilled 

screw holes are positioned in overlap of horizontal batten (See arrows in Fig 1a), 
and that horizontal battens face outwards, fix panels together using 3no 30mm 
screws (See Figs.1b, 1c & 1d). Repeat to attach subsequent panels to form a  
square (tapered) obelisk.  

 

 

2.

   Locate Cap (B) into top of obelisk and fix in position using 4no 45mm screws 

(See Figs 2a & 2b) 

  

Отзывы: