Please take a few moments to check all pack contents listed on page 1 of the
Assembly Instructions.
Please contact “Zest4Leisure” directly if any of the pack contents are damaged
or missing. Contact telephone: 01352 752 555 Option 1 or email:
[email protected]
Assembly requires 2 persons. All screw holes to be pre-drilled.
Tools required: Corded/Cordless Drill, Pozidrive Bit/Screwdriver, 3mm Drill Bit.
Snowdon Obelisk is now complete.
1.
Align two Trellis Panels (A) together as shown in Fig 1a. Ensuring that predrilled
screw holes are positioned in overlap of horizontal batten (See arrows in Fig 1a),
and that horizontal battens face outwards, fix panels together using 3no 30mm
screws (See Figs.1b, 1c & 1d). Repeat to attach subsequent panels to form a
square (tapered) obelisk.
2.
Locate Cap (B) into top of obelisk and fix in position using 4no 45mm screws
(See Figs 2a & 2b)
Содержание Snowdon Obelisk
Страница 4: ...www zest4leisure co uk 1b 1a 2a 1c 1d 2b...