Please take a few moments to check all pack contents listed on page 1 of the
Assembly Instructions.
Please contact “Zest4Leisure” directly if any of the pack contents are damaged
or missing. Contact telephone: 01352 752 555 Option 1 or email:
[email protected]
Assembly requires 2 persons. All screw holes to be pre-drilled.
Tools required: Corded / Cordless Drill, Pozi-drive Bit / Screwdriver, 3mm Drill
Bit.
Shrewsbury Planter is now complete.
1.
Position End Panels (A) on Side Panel (B) as shown in Fig 1a. Fix together using
3no 55mm screws per corner (Fig 1b). Place assembly on a flat surface, position
and fix remaining Side Panel as shown in Fig 1c & 1d.
2.
Locate Base Panel (C) as shown in Fig 2a. Attach using 8no 55mm screws as
shown in Fig 2b (4no per long side).
Содержание Shrewsbury Planter
Страница 4: ...www zest4leisure co uk 1b 1a 1c 1d 2a 2b ...