Installation & Maintenance
INSTALLATION OF eco SMART
Location Of The Unit:
Install the unit in dry place, do not install the unit in hot area. Ensure a drainage
point for reject water.
Install it atleast one foot away from the wall to access enough working space
All units are provided with extra length of tubing. Please do not cut the extra
tubing.
Please do not terminate the reject line directly in to the drainage , fasten it well
above the drainage
Provide shade in case of outdoor installations.
Sufficient ventilation is required.
Installation Requirements:
Electrical requirements: 230V + 10%, 5 Amp. Socket with proper earthing to be
made available at the point of installation.
Plumbing requirements:
1/2” water line with minimum of 1 kg/cm2 pressure and minimum flow of the
inlet water line should be 450 LPH for RO 150lph, 300 LPH for RO 100lph unit and
150LPH for RO 50lph unit to be assured.
Drainage line is required within a distance of 1 meter from the unit. The reject
(drain) line should be kept well above the drain line
.
How to install the unit ?
After opening the unit from the packing, check for damages, loose hydraulic
connections and nut/bolt fittings.
The sediment filter 20” and the carbon filter 20” is already installed in the unit.
The water saver cartridges is also installed but inlet & outlet tubing are not
connected,
remove plugs & connect the tubings.
Provide an inlet valve with ½” BSP, female outlet with ½” fitting elbow. (customer’s
scope).
Connect the ½” stem adapter with ½” fitting elbow given with the unit into the ½”
BSP female opening of the inlet valve.
Terminate the drain line of the unit to the drainage. Ensure the drain line of the
unit is 3 – 4 inches above the drainage and is not inserted in the drainage.
INSTALLATION OF eco SMART
Location Of The Unit:
Install the unit in dry place, do not install the unit in hot area. Ensure a drainage
point for reject water.
Install it atleast one foot away from the wall to access enough working space
All units are provided with extra length of tubing. Please do not cut the extra
tubing.
Please do not terminate the reject line directly in to the drainage , fasten it well
above the drainage
Provide shade in case of outdoor installations.
Sufficient ventilation is required.
Installation Requirements:
Electrical requirements: 230V + 10%, 5 Amp. Socket with proper earthing to be
made available at the point of installation.
Plumbing requirements:
1/2” water line with minimum of 1 kg/cm2 pressure and minimum flow of the
inlet water line should be 450 LPH for RO 150lph, 300 LPH for RO 100lph unit and
150LPH for RO 50lph unit to be assured.
Drainage line is required within a distance of 1 meter from the unit. The reject
(drain) line should be kept well above the drain line
.
How to install the unit ?
After opening the unit from the packing, check for damages, loose hydraulic
connections and nut/bolt fittings.
The sediment filter 20” and the carbon filter 20” is already installed in the unit.
The water saver cartridges is also installed but inlet & outlet tubing are not
connected,
remove plugs & connect the tubings.
Provide an inlet valve with ½” BSP, female outlet with ½” fitting elbow. (customer’s
scope).
Connect the ½” stem adapter with ½” fitting elbow given with the unit into the ½”
BSP female opening of the inlet valve.
Terminate the drain line of the unit to the drainage. Ensure the drain line of the
unit is 3 – 4 inches above the drainage and is not inserted in the drainage.
Содержание eco smart
Страница 1: ...USER MANUAL 50 100 150 LPH RO WATER PURIFIER...
Страница 14: ...Trouble shooting...