
Fitting Instructions
Zero 88 reserves the right to make changes to the equipment described in this manual without prior notice.
This equipment is designed for professional stage lighting control, and is unsuitable for any other purpose. It should be used by, or under the supervision of, appropriately
qualified or trained persons only. E & OE
Servicing of this equipment should be attempted by suitably qualified persons only.
Zero 88
Usk House, Llantarnam Park, Cwmbran. NP44 3 HD U.K.
Tel: +44 (0) 1633 838088 Fax: +44 (0) 1633 867880
Email:
Web:
www.zero88.com
Issue: 01
Date:29/06/07
Doc. No. 7327500/Fi8319
6.
Fit the retained plastic nuts and washers to the two audio jack connectors. Fit the two M3 plastite
screws and toothlock washers to the XLR3M SMPTE connector.
7.
Lower the base panel into position and slot it into the groove on the rear of the front panel
assembly, being careful not to trap any wires, and secure the base to sides using the four screws
removed initially.
8.
Affix the connector identification label to exterior of base above connectors.